Attachment 1. Performance Work Statement Cylinder Rebuild Redacted
Updated
A PDF document (820 KB) attached to Intent to Sole Source - ELPAR Cylinder Refurbish, from the Department of the Navy. Due Oct 28, 2026, 9:00 PM (UTC-7).
File name: Attachment 1. PWS Cylinder Rebuild Redacted.pdf
The full file is for paid members, or buy this bid alone.
Preview
CUI
PERFORMANCE WORK STATEMENT (PWS)
Refurbishment of Elwell Parker R335 Main Lift
PART 1
GENERAL INFORMATION
1. GENERAL: This is a non-personal services contract to provide refurbish of Elwell Parker R335’s Main Lift Cylinders. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. 1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform rebuild of Elwell Parker R335’s Main Lift Cylinders as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract. 1.2 Background: Elwell Parker R335 is the primary lifting and handling equipment used on shaft replacement at the Puget Sound Naval Shipyard. The manufacturer no longer makes these units, and parts have become harder to acquire in years past. By refurbishing the cylinders on Elwell Parker R335, we can continue to utilize the equipment as intended.
1.3 Objectives: To recondition the provided Elwell Parker R335’s main lift cylinders as described in Part 5, Specific Tasks, such that repaired equipment functions as intended. Contractor maintains close liaison and good communications with Government personnel. Also, provide a final condition and status report, as outlined in Technical Exhibits.
1.4 Scope: Recondition Elwell Parker R335’s two main lift cylinders as outlined in Part 5, Specific Tasks. The contractor shall accomplish a final test of Elwell Parker R335’s main lift, and provide performance results following the Technical Exhibits provided at the end of this PWS. 1.5 Period of Performance: Due to emergent shipyard operational commitments and scheduled waterfront maintenance milestones, the Period of Performance for this urgent requirement shall commence on November 25, 2026. All disassembly, inspection, rebuild, testing, and painting shall be completed and the cylinders shall be made available for Government pickup no later than six (6) weeks from the start of the performance period.
1.6 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement
The beginning of the document. Download the full file to read on.