Home / Turkey Hazardous Waste Solicitation / Document

Attachment 1: Performance Work Statement Turkey

Updated

A PDF document (491 KB) attached to Turkey Hazardous Waste Solicitation, from the Defense Logistics Agency. Due Nov 12, 2026, 9:00 AM (UTC-5).

File name: Attach 1_PWS_Turkey_v201026.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PERFORMANCE WORK STATEMENT

TURKEY HAZARDOUS WASTE DISPOSAL CONTRACT

01 April 2026 (MSR), v201026

INTRODUCTION

CONTRACTOR PERSONNEL

1.0 REMOVAL PHASES

1.1 PRE-REMOVAL

1.1.1 CLIN SELECTION CRITERIA

1.1.2 PERMITS AND SPECIAL REQUIREMENTS

1.1.3 SHIPPING AND DISPOSAL DOCUMENTATION

1.1.4 CLIN DISPUTES

1.1.5 NOTIFICATIONS

1.1.6 CONVEYANCE VEHICLE, TRAILER, AND SHIPPING CONTAINER

SECURITY

1.1.7 HOURS OF OPERATION AND STANDARD BUSINESS DAYS

1.1.8 CONTRACT RELATED INFORMATION DISCLOSURE

1.1.9 RESERVED

1.1.10 INSTALLATION ACCESS REQUIREMENTS

1.2 REMOVAL

1.2.1 SPILL RESPONSIBILITY

1.2.2 SEGREGATION OF U.S. AND NON-U.S. HM/HW

1.2.3 STATEMENT ON CONTAINERS

1.2.4 USG EQUIPMENT AND PERSONNEL

1.2.5 TREATMENT OF HM/HW ON U.S. MILITARY INSTALLATIONS

1.2.6 LOADING

1.2.7 WEIGHING OF ITEMS

1.2.7.1 TASK ORDER (TO) ADJUSTMENTS

1.2.8 DEFINITIONS, BULK AND CONTAINERIZED WASTE

1.2.8.1 BULK WASTE

1.2.8.2 CONTAINERIZED WASTE

1.2.9 BULK LIQUID PUMPING

1.2.10 BULKING AND CONSOLIDATION

1.2.11 STANDARD AND EXPEDITED PERFORMANCE TIMES

1.3 POST-REMOVAL

1.3.1 RETURN OF SHIPPING DOCUMENTATION

2.0 DISPOSAL/RECYCLING

2.1 CERTIFICATES OF DISPOSAL/DESTRUCTION AND RECYCLING

2.2 EMPTY CONTAINERS

2.3 TREATMENT TECHNOLOGIES

SP4500-26-D-XXXX

2.4 RECYCLING

2.5 AFFF AND OTHER PFAS-RELATED WASTES

2.6 DEMILITARIZATION

2.6.1 RESERVED

2.7 PCB-RELATED WASTES

2.8 COMPRESSED GAS CYLINDERS AND CARTRIDGES

3.0 SPECIAL SERVICES

3.1 RENTAL EQUIPMENT SUMMARY – ROLL-OFF BOXES (ROB) ROLL-OFF

CONTAINERS

3.2 DAILY RENTAL OF A LINED 7-Yd3, 20-Yd3 and 40Yd3 ROB WITH

COVER – CLINs 1010RE, 1020RE and 1040RE.

3.3 WEEKLY RENTAL OF A LINED 7-Yd3, 20-Yd3 and 40Yd3 ROB WITH

COVER – CLINs 1011RE, 1021RE and 1041RE.

3.4 MONTHLY RENTAL OF A LINED 7-Yd3, 20-Yd3 and 40Yd3 ROB WITH

COVER – CLINs 1012RE, 1022RE and 1042RE.

3.5 INITIAL PLACEMENT OR REMOVAL OF EMPTY RENTED ROB –

CLIN1200RE

3.5.1 MOVE EMPTY ROB WITHIN INSTALLATION – CLIN 1100SV

3.5.2 CONTAINER RENTALS – CLINs 1305RE and 1307RE

3.6 RESERVED

3.7 INDUSTRIAL CLEANING SERVICES (ICS), DAILY, CREW OF 2 – CLIN

1002SV

3.8 RESERVED

3.9 ICS, WEEKLY, CREW OF 2 – CLIN 1003SV

3.10 ICS, DAILY, CREW OF 3 – CLIN 1007SV

3.11 ICS, WEEKLY, CREW OF 3 – CLIN 1008SV

3.12 SURCHARGE FOR WEEKEND ICS WORK, DAILY, CREW OF 2 – CLIN

1080SV

3.13 SURCHARGE FOR WEEKEND ICS WORK, DAILY, CREW OF 3 – CLIN

1081SV

3.14 ADDITIONAL CHARGE FOR PERMIT-REQUIRED CONFINED SPACE

WORK, DAILY, CREW OF 3 – CLIN 1083SV

3.15 PERFORM LABORATORY ANALYSIS (Applies to all Sampling & Analysis

CLINS)

3.16 PERFORM WASTE CHARACTERIZATION TO IDENTIFY WASTE AND

PROVIDE HWPS – CLIN 1001SA

3.17 PERFORM OVERPACKING/LOOSE PACKING SERVICES – CLINs 1202SV1207SV

The beginning of the document. Download the full file to read on.

Other documents in this bid