Schedule of Items
Project Name: Oconaluftee Waterline Replacement
7/29/2026
Item
No

Description

Unit

Quantity

Unit Price

Base Items
0001

Mobilization

LS

0002

Erosion Control

LS

0003

Utility Locates

LS

0004

Construction Signage and Temporary Barricades

LS

0005

Tracer Wire Includes access box w/ ground rod, wire, terminals.

LS

LINEAL FEET

EACH

LS

LS

EACH

EACH

EACH

0006

0007

0008
0009

0010
0011
0012

Construct 6" PVC C-900 Main Waterline Open excavation, includes excvation, pipe, bedding, backfill, fittings, thrust blocks, disinfection and testing, warning tape and other associated miscellaneous work associated with new waterline intsllation and selective demolition of existing above ground water system components designated for removal.
Water Service Replacement - 2"-4", includes connection to water main and to building water system within 3' of building foundation or as indicated on plans for exterior backflow device connections Includes pipe sizes indicated in drawings, valves of matching size, valve boxes, excvation, bedding, fill, fittings, and associated incidental work for the interconnection of existing buildings and new water main.
Turf Restoration , Grading, Seeding/Mulching
Concrete/Pavement Restoration- Estimated quantity (620 sf) is based on 24" wide width for all indicated concrete pavement waterline crossings and 100 sf per hydrant area patching. Fire Hydrant- Includes removal of existing hydrant and valve, connection to main, hydrant, gate valve, valve box, bedding, backfill, fittings.
6" Gate Valve with restrained joints and valve box. Note: hydrant valves are paid under Fire Hydrant line item.
Blow off assembly

TOTAL BASE ITEMS:

Optional Items
0013

Utility Locates, Investigation, Excavation/Restoration

LS

0014

Construct 6" PVC C-900 Main Waterline - Open excavation, includes excvation, pipe, bedding, backfill, fittings, thrust blocks, disinfection and testing and other associated miscellaneous work associated with new waterline intsllation and selective demolition of existing pipe to be removed. Estimated quantity of 40 lf used.

LS

0015

Water Service Replacement - All sizes, includes connection to water main and to building water system within 3' of building foundation or as indicated on plans for exterior backflow device connections Includes pipe sizes indicated in drawings, valves of matching size, valve boxes, excvation, bedding, fill, fittings, and associated incidental work for the interconnection of existing