SECTION 010150
GENERAL REQUIREMENTS
PART 1 – SUMMARY OF WORK
1.1
A.
1.2
A.
1.3
A.
1.4
DESCRIPTION
Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows: 1.
Install new water main, water services to dormitories and laundry building, fire hydrants, blow off assembly, and new valving as indicated in drawings. Upon completion and testing of new lines, switch over from existing waterlines, remove above ground existing waterline components not indicated for re-use and complete site restoration. Buildings will be occupied during construction, The Contractor shall provide safety fencing around excavations at all times when not attended by the Contractor, and shall ensure that egress routes from buildings are maintained throughout the construction contract. Minimize water outages to the extent possible, all buildings shall have water at the end of every work shift. All outages shall be coordinated in advance with the Center Point of Contact and Contracting Officer’s Representative (COR). The Contractor shall locate all utilities private and public prior to start of ground disturbing activities and notify the COR if field located water lines vary significantly from locations indicated in the drawings.
LOCATION
This project is located at the Oconaluftee Job Corps Civilian Conservation Center located four miles from Cherokee, North Carolina in Swain County. The address is 502 Oconaluftee Job Corps Rd, Cherokee, NC 28719. Driving instructions can be obtained from the Center by calling 828-497-5411.
WORK HOURS
Work hours for this project are between 8:00 AM-4:30 PM Monday through Friday except federal holidays unless approved in advance by the Contracting Officer.
USE OF PREMISES
A.
Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B.
Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the work so as not to interfere with Government's day-today operations.
OCONALUFTEE WATERLINE REPLACEMENT
OCONALUFTEE JOB CORPS CCC
010150 – 1
GENERAL REQUIREMENTS
C.
1.5
A.
1.6
A.
1.7
A.
Keep driveways, parking areas, loading areas and entrances to buildings clear and available to Government, Government's employees, and emergency vehicles at all times.