Home / Slv-Cb Pumping Plant Roof / Document

Attachment 1: SLV-CB PUMPING PLANT ROOF Statement of Work

Updated

A Word document (504 KB) attached to Slv-Cb Pumping Plant Roof, from the Bureau of Reclamation. Due Nov 2, 2026, 1:00 PM (UTC-7).

File name: Attachment_1_-_SLV-CB_PUMPING_PLANT_ROOF_SOW.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Statement of Work
(Roof Repair)
- Introduction
The Bureau of Reclamation, Upper Colorado Region, Albuquerque Area Office, Alamosa Field Division (Reclamation) is looking to repair or replace the flat roof on the San Luis Lakes Pumping Plant Building located within San Luis Lake State Wildlife Area near Mosca, Colorado. The work will address existing leaks, structural degradation, membrane failure, drainage issues, and any other deficiencies that compromise the building envelope or threaten facility operations. The purpose of this project is to restore full weather protection to the pumping plant structure and ensure longterm reliability of the facility. Contractor shall perform all demolition, furnish all equipment and materials and perform required work. - Abbreviations, Definitions, and Acronyms
The Bureau of Reclamation commonly used definitions are listed below:

AFD -Alamosa Field Division
BOR -Bureau of Reclamation CO -Contracting Officer
COR -Contracting Officer’s Representative CS -Contracting Specialist MDT -Mountain Daylight Time
OGR -Onsite Government Representative RSN -Required Submittal Number SEMS -Sustainability and Environmental Management System (BOR)

- North American Industry Classification System (NAICS) The NAICS for this work is 238160.
1.3- Location and Hours of Operations
The Pumping Plant is located at 16399 Lane 6 N, Mosca, Colorado 81146, in Alamosa County at Latitude 37º 39’ 57.51” and Longitude 105º 43’ 52.85”. The Alamosa Field Division office is approximately 1.7 miles northeast of downtown Alamosa, Colorado at 10900 US Highway 160 E, Alamosa, Colorado 81101. Reclamation’s standard business hours are Monday through Friday from 07:30 AM to 4:00 PM MDT except Federal Holidays. Reclamation is a smoke, drug, and alcohol-free facility. 1.4- Facility Access and Deliveries
Contractor shall inform the CO and COR a minimum of 5 working days prior to mobilizing personnel, equipment, and materials/supplies to the project site. In addition, if the Contractor would like to have delivery of materials and/or supplies direct shipped to the project site, the Contractor shall notify Ms. Susan Storm and COR a minimum of 3 working days (seventy-two hours) prior to the delivery of materials/supplies. The Contractor shall communicate with Susan the following:

Provide a detail list of items to be shipped and arrive at the Alamosa Field Division (AFD) Provide the shipping company’s name and related information Provide estimated day and time the items are to arrive at AFD Ms. Susan Storm contact information is as follows:

The beginning of the document. Download the full file to read on.

Other documents in this bid