Attachment 1: Specifications
Updated
A PDF document (13.0 MB) attached to East Canal Efficiency Improvements, from the Bureau of Reclamation. Due Nov 20, 2026, 1:00 PM (UTC-7).
File name: 140R4026R0025_Attachment_1_-_Specifications.pdf
The full file is for paid members, or buy this bid alone.
Preview
East Canal Efficiency Improvements
Project
Uncompahgre Project - Colorado
U.S. Department of the Interior
Bureau of Reclamation
Western Colorado Area Office
Grand Junction, Colorado
SPECIFICATIONS
June 2026
This page intentionally left blank.
EAST CANAL EFFICIENCY IMPROVEMENTS – UNCOMPAHGRE PROJECT,
COLORADO
FOREWORD
This solicitation involves furnishing and installing several sections of Pipeline diverting existing open-channel water from the West Loutsenhizer Arroyo into a pipeline system for the Uncompahgre Project to supplement the East Canal as well as upgrading existing components of the East Canal.
The system is on the East Canal portion of the Uncompahgre Project located East of Olathe, Colorado. This project includes furnishing and installing 36-inch HDPE pipe, two parallel 54inch HDPE pipes, and 48-inch and 42-inch polypropylene pipe. The project will also include furnishing and placing concrete for hydraulic structures and fabrication and installation of miscellaneous metalwork.
This page intentionally left blank.
140R4026R0025
Uncompahgre Project
East Canal Efficiency Improvement
Solicitation No.
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES COSTS
EAST CANAL EFFICIENCY IMPROVEMENT – UNCOMPAHGRE PROJECT,
COLORADO
B.1
PRICE SCHEDULE
(a)
Offers will be considered for award based on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule. (1)
Offerors shall complete the Price Schedule. Offers that do not include all completed Price Schedule CLIN items will be considered non-responsive and will not be evaluated for award.
(2)
Offers will be evaluated based on the total of the Price Schedule.
(b)
Offers are subject to the terms and conditions of this solicitation.
(c)
Quantities in the Price Schedule are estimated quantities for comparison of offers only. Except as provided in the contract clause - Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause Variation in Estimated Quantity does not apply to lump sum items.
(d)
See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(e)
Definitions:
(1)
CLIN – Contract Line-Item Number
PRICE SCHEDULE
CLIN
Section
Supplies or Services
WBR
1452.23
2-81
Mobilization and Preparatory
Work
For the lump sum of
$
02 41 07
Removal and Disposal of
Existing Features
For the lump sum of
$
03 30 00
Concrete for Diversion
Pipeline Inlet Structure
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Attachment 2: Drawings
- Attachment 3: Wage Determination Heavy - Montrose County CO
- Attachment 4: Wage Determination Building - Montrose County CO
- Attachment 6: Past Performance Questionnaire
- Attachment 7: Experience Form
- Attachment 8: Key Personnel Form
- Sol
- Site Visit Agenda 0001
- Sol Amendment 0001