High Pressure Nitrogen and Equipment
STATEMENT OF WORK
1. SCOPE
1.1. Portsmouth Naval Shipyard (PNSY) is seeking to rent a temporary high pressure nitrogen gas tube trailer. This specification reflects those characteristics which are essential to the minimum needs of the government for the procurement of consumable gas and rental equipment to provide High Pressure Nitrogen to New London, Connecticut (NLON).
2. APPLICABLE DOCUMENTS
2.1. Issues of Publications - The following documents, which are in effect on the date the solicitation is issued, are a part of this specification to the extent applicable, or as specified herein. Within the specification, they shall be referred to by their basic designation only.
2.1.1. Government
2.1.1.1.
Code of Federal Regulations
2.1.1.1.1.
A-A-59155 Commercial item description Nitrogen, high purity, special purpose
2.1.1.2.
Federal Standards
2.1.1.2.1.
FED-STD-313D - Material Safety Data, Transportation Data, And Disposal Data For Hazardous Materials Furnished To Government Activities
2.1.1.3.
UIPI 0505-908 LEVEL II AND III CLEANLINESS FOR PIPING
SYSTEMS/EQUIPMENT
2.1.1.4.
29 CFR 1910 - Occupational Safety and Health Standards
2.1.2. Nongovernment
2.1.2.1.
American National Standards Institute INC, (ANSI)
2.1.2.1.1.
ANSI/AMT B11.19 – Performance Criteria for Safeguarding
2.1.2.1.2.
ANSI MH 10.8.2 – Data Application Identifier Standard
2.1.2.2.
National Fire Protection Association (NFPA)
2.2. Order of precedence - In the event of conflict between the text of this specification and that of the references cited above, the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws or regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1. High Pressure Nitrogen Gas Tube Trailer
3.1.1. Qty 1, trailer mounted Nitrogen Gas Tube DOT rated trailer able to be delivered, and left for use, not to exceed 1 replacement.
Spec #: HP Nitrogen Gas-Cold Spray
Rev: A
High Pressure Nitrogen and Equipment
3.1.1.1.
Upon depleting the trailer to the minimum usable pressure, the expected trailer replacement will be within 24 hours after notification with an expedited delivery option not to exceed 12 hours.
3.1.2. If expedited delivery option is not exercised the Contractor shall be required to replace the trailer within 24 hours after notification. 3.1.3. Pressure vessel testing certifications, on all tube trailers, shall be up to date, valid and not expiring within time frame the tube trailer in use at Portsmouth Naval