v4.11_JULY2026
STATEMENT OF WORK (SOW)
B114 Piping Insulation
1.0 Background
The Naval Undersea Warfare Center Division, Newport’s (NUWCDIVNPT) Code 1021 Facilities Maintenance and Operations Branch is responsible for keeping buildings, roads, grounds, and utilities in good working conditions. The heating, ventilation and air conditioning (HVAC) systems need routine maintenance and replacement as needed. The HVAC system in B114 is being replaced and has a need for piping insulation to avoid safety hazards. 1.1 Place of performance – B114, Naval Undersea Warfare Center Division, Newport, RI 1.2 Authorized user – NUWCDIVNPT Facilities Maintenance and Operations
1.3 Sponsors – NUWCDIVNPT
1.4 Type of funding – Overhead
2.0 Scope
The Contractor shall furnish all supervision, certified personnel, tooling, materials, containment, apparatus, and equipment necessary to insulate all exposed, uninsulated Schedule 80 PVC and copper EAFW piping within B114. Work shall strictly eliminate condensation and comply with Unified Facilities Guide Specifications (UFGS) 23 07 00 (Thermal Insulation for Mechanical Systems) and Unified Facilities Criteria (UFC) 3-410-01 (Heating, Ventilating, and Air Conditioning Systems).
The pipe runs, diameters, and fitting counts listed below represent the Government's best available engineering estimate. The Contractor is strictly responsible for conducting in-field measurements during the pre-quote site visit or pre-construction phase to verify exact linear footage, dimensional fit, hanger clearances, and fitting counts prior to material fabrication and installation:
a. 1 ¼” PVC pipe, insulation thickness 1”, type Elastomeric, Linear Feet 90’, 26 fittings, 0 hangers
b. 1 ½” PVC pipe, insulation thickness 1”, type Elastomeric, Linear Feet 45’, 4 fittings, 7 hangers.
c. 1 ½” Copper pipe, insulation thickness 1”, type Elastomeric, Linear Feet 6’, 4 fittings, 0 hangers
d. 2” PVC pipe, insulation thickness 1”, type Elastomeric, Linear Feet 160’, 50 fittings, 0 hangers
e. 3” PVC pipe, insulation thickness 1”, type Elastomeric, Linear Feet 80, 10 fittings, 15 hangers
f. Material total: 381’ linear feet of pipe, 94 fittings, 22 hangers 2.1 Program or Systems Supported: B114 HVAC system
v4.11_JULY2026
3.0 Applicable Documents
UFC 3-410-01 HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS
UFS 3-410-01 - HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS
UFGS 23 07 00 – THERMAL INSULATION FOR MECHANICAL SYSTEMS
4.0 Project Requirements and Submittals