Attachment 1: Statement of Work B114 HVAC PIPING INSULATION

Updated

A PDF document (296 KB) attached to Construction-NUWCDIVNPT HVAC Piping Insulation, from the Department of the Navy. Due Nov 20, 2026, 2:00 AM (UTC-5).

File name: Attachment_1_Statement of Work_B114 HVAC PIPING INSULATION .pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

v4.11_JULY2026

STATEMENT OF WORK (SOW)

B114 Piping Insulation

1.0 Background

The Naval Undersea Warfare Center Division, Newport’s (NUWCDIVNPT) Code 1021 Facilities Maintenance and Operations Branch is responsible for keeping buildings, roads, grounds, and utilities in good working conditions. The heating, ventilation and air conditioning (HVAC) systems need routine maintenance and replacement as needed. The HVAC system in B114 is being replaced and has a need for piping insulation to avoid safety hazards. 1.1 Place of performance – B114, Naval Undersea Warfare Center Division, Newport, RI 1.2 Authorized user – NUWCDIVNPT Facilities Maintenance and Operations

1.3 Sponsors – NUWCDIVNPT

1.4 Type of funding – Overhead

2.0 Scope

The Contractor shall furnish all supervision, certified personnel, tooling, materials, containment, apparatus, and equipment necessary to insulate all exposed, uninsulated Schedule 80 PVC and copper EAFW piping within B114. Work shall strictly eliminate condensation and comply with Unified Facilities Guide Specifications (UFGS) 23 07 00 (Thermal Insulation for Mechanical Systems) and Unified Facilities Criteria (UFC) 3-410-01 (Heating, Ventilating, and Air Conditioning Systems).
The pipe runs, diameters, and fitting counts listed below represent the Government's best available engineering estimate. The Contractor is strictly responsible for conducting in-field measurements during the pre-quote site visit or pre-construction phase to verify exact linear footage, dimensional fit, hanger clearances, and fitting counts prior to material fabrication and installation:
a. 1 ¼” PVC pipe, insulation thickness 1”, type Elastomeric, Linear Feet 90’, 26 fittings, 0 hangers
b. 1 ½” PVC pipe, insulation thickness 1”, type Elastomeric, Linear Feet 45’, 4 fittings, 7 hangers.
c. 1 ½” Copper pipe, insulation thickness 1”, type Elastomeric, Linear Feet 6’, 4 fittings, 0 hangers
d. 2” PVC pipe, insulation thickness 1”, type Elastomeric, Linear Feet 160’, 50 fittings, 0 hangers
e. 3” PVC pipe, insulation thickness 1”, type Elastomeric, Linear Feet 80, 10 fittings, 15 hangers
f. Material total: 381’ linear feet of pipe, 94 fittings, 22 hangers 2.1 Program or Systems Supported: B114 HVAC system

v4.11_JULY2026

3.0 Applicable Documents

UFC 3-410-01 HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS

UFS 3-410-01 - HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS

UFGS 23 07 00 – THERMAL INSULATION FOR MECHANICAL SYSTEMS

4.0 Project Requirements and Submittals

The beginning of the document. Download the full file to read on.