STATEMENT OF WORK PINE CREEK VAULT TOILET

SCOPE OF CONTRACT

Description of work
Base Bid:
Work shall include transporting and installing a government-furnished single CXT vault concrete toilet at Pine Creek Campground. The toilet shall be transported from the Forest Service warehouse located in Austin, NV (100 Midas Canyon Road, Austin, NV 89310) The Contractor shall be responsible for providing all equipment and labor to load, transport, place and install government-furnished structure. The contractor shall be responsible for protecting the structure in all phases of the performance of the work. Contractor may be held responsible for any damage caused to the structure in the loading, transporting, offloading, or placing of the structure.

Option 1:
Work shall include removing and disposing of the existing toilet at Pine Creek Campground. Contractor shall fill in the remaining hole and recontour to match surrounding conditions.

PROJECT LOCATION

A.Pine Creek Campground is located near Round Mountain, Nevada at coordinates 38.79580, -116.84900 W.

SITE INFORMATION AND LIMITATIONS

The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items: Pine Creek Campground will both remain open with campers present during construction. Pine Creek Campground is accessed on a dirt road that may be rough in areas. Contractor will provide all materials and labor necessary to protect streams, wet or dry, during construction activities. All construction equipment shall be pressure-washed before entering National Forest System lands. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations. Permits required by County, State, or Federal laws or regulations shall be obtained by the Contractor Contractor shall provide adequate signage and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas. No water, electricity, or other utilities will be available to the contractor.

TRAFFIC CONTROL AND CONSTRUCTION SIGNING

A.No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the COR. Construction signage for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items