Home / Renovate Space for Patient Care Improvements / Document

Attachment 2: Bid Specifications

Updated

A PDF document (11.7 MB) attached to Renovate Space for Patient Care Improvements, from the Department of Veterans Affairs. Due Oct 29, 2026, 10:00 AM (UTC-4).

File name: Attachment 2 Final Bid Specs.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

A/E Renovate Space for Patient
Improvements
Asheville VAMC
Final Bid Specifications
Contract No. 36C24623C0061 | Project No. 637-22-102
3/12/2026

Above Group, Inc.
305 East Dr. Suite H
Melbourne, FL 32904
(321) 345-9026
www.abovegroupinc.com

Department of Veterans Affairs
Asheville VAMC
1100 Tunnel Rd.
Asheville, NC 28805

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

Section 00 01 10

SECTION NO

DIVISION AND SECTION TITLES

DATE

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00

01 32 16.15

01 33 23

01 35 26

01 42 19

01 45 00

01 57 19

01 58 16

01 74 19

01 81 13

01 91 00

General Requirements
Project Schedules (Small Projects – Design/Bid/Build
Shop Drawings, Product Data, and Samples
Safety Requirements
Reference Standards
Quality Control
Temporary Environmental Controls
Temporary Interior Signage
Construction Waste Management
Sustainable Construction Requirements
General Commissioning Requirements

11-21
01-24
11-23
05-24
11-20
02-21
01-21
07-15
04-22
10-17
04-22

DIVISION 02 – EXISTING CONDITIONS

02 41 00

Demolition

08-17

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00

Rough Carpentry

10-17

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13

07 81 00

07 84 00

07 92 00

Thermal Insulation
Applied Fireproofing
Firestopping
Joint Sealants

01-21
07-23
01-21
04-22

DIVISION 08 - OPENINGS

08 11 13

08 14 00

08 31 13

08 71 00

08 71 13

Hollow Metal Doors and Frames
Interior Wood Doors
Access Doors and Frames
Door Hardware
Automatic Door Operators

01-21
01-21
04-22
03-24
01-21

DIVISION 09 – FINISHES

09 05 16

09 06 00

09 22 16

09 29 00

09 51 00

Subsurface Preparation for Floor Finishes
Schedule for Finishes
Non-Structural Metal Framing
Gypsum Board
Acoustical Ceilings

00 01 10-1

01-21
01-21
06-18
04-20
12-18

SECTION NO

09 65 13

09 65 16

09 65 19

09 91 00

DIVISION AND SECTION TITLES

Resilient Base and Accessories
Resilient Sheet Flooring
Resilient Tile Flooring
Painting

DATE

01-21
06-22
05-18
01-21

DIVISION 10 – SPECIALTIES

10 14 00

10 26 00

Signage
Wall and Door Protection

01-21
01-21

DIVISION 12 – FURNISHINGS

12 36 00

Countertops

12-23

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41

Seismic Restraint Requirements for Non-Structural Components

01-21

DIVISION 21- FIRE SUPPRESSION

21 08 00

21 13 13

Commissioning of Fire Suppression System
Wet-Pipe Sprinkler Systems

11-16
06-15

DIVISION 22 – PLUMBING

22 05 11

22 05 23

22 07 11

22 08 00

22 11 00

22 13 00

22 40 00

Common Work Results for Plumbing

The beginning of the document. Download the full file to read on.

Other documents in this bid