Home / Operations and Maintenance (O&M) Services for the SBIWTP / Document

Attachment 2: FY26 SBIWTP O&M Quality Assurance Surveillance Plan

Updated

A PDF document (202 KB) attached to Operations and Maintenance (O&M) Services for the SBIWTP, from the International Boundary and Water Commission: Us-mexico. Due Jan 6, 2027, 2:00 PM (UTC-7).

File name: Attch. 02 FY26 SBIWTP O&M QASP.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

2026

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Operation and Maintenance of the South Bay International Wastewater Treatment Plant and Facilities
for the

United States Section, International Boundary and Water Commission (USIBWC)

Quality Assurance Surveillance Plan

O&M for SBIWTP 2026

1.0
1.1
1.2
1.3
2.0
3.0
4.0
5.0
6.0
7.0.

Appendices and Forms below identifies performance-based measures which will be used to monitor Contractor performance. The United State Section of the International Boundary and Water Commission (USIBWC) will periodically evaluate the Contractor’s performance by appointing a representative(s) to monitor performance to ensure services are received. The USIBWC representative will evaluate the Contractor’s daily, or weekly, performance through personal dealings and direct inspections of work products and demonstrated knowledge of applicable regulations. The USIBWC may conduct random facility inspections and increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections or because of repeated customer complaints. Likewise, the USIBWC may decrease the number of quality control inspections if performance dictates. The USIBWC representative shall make final determination of the validity of customer complaint(s).
If any of the services do not conform to contract requirements, the USIBWC may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by re-performance, the USIBWC may:
(a) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
(b) Reduce the contract price to reflect the reduced value of the services performed. Price reductions will be in accordance with the acceptable quality level identified in the required performance metrics table.
(c) Increase the contract price to reflect the value of the services performed. Price increase will be in accordance with the acceptable quality level identified in the required performance metrics table.

Quality Assurance Surveillance Plan

O&M for SBIWTP 2026

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

1.0

INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the Performance Work Statement (PWS) for USIBWC Administration Services of the Operation and Maintenance of the South Bay International Wastewater Treatment Plant (SBIWTP) and

The beginning of the document. Download the full file to read on.

Other documents in this bid