Attachment 9: SBIWTP Capital Project List as of
Updated
A PDF document (376 KB) attached to Operations and Maintenance (O&M) Services for the SBIWTP, from the International Boundary and Water Commission: Us-mexico. Due Jan 6, 2027, 2:00 PM (UTC-7).
File name: Attch. 09 SBIWTP Capital Project List as of September 2025.pdf
The full file is for paid members, or buy this bid alone.
Preview
Urgent repairs at SBIWTP to restore performance and add redundancy in process:
ACTION
DESCRIPTION
Repair Influent flow meter
and associated piping and
valves
Replace deteriorated CementLined Ductile Iron (CLDI) piping and flow meter
Emergency Maintenance due to
excess trash and sediment from
excess inflows from MX
Clean PSTs #1-4
COST
DATE
AWARDED
NOTES
$1,791,532
8/17/2021
Completed
$1,782,473
7/28/2023
Completed
Repair Junction Box #1
Design and construction
$5,793,110
8/10/2023
Complete
Rehab PSTs #1-5
Emergency Maintenance due to
trash and sediment from excess
inflows from MX
$2,384,511
8/14/2023
Completed
Rehab USST #1&2
$2,979,490
9/29/2023
Complete by Summer 2026
$3,992,690
9/29/2023
Completed
$197,543
8/9/2024
Modification for required
electrical work
$439,065
2/16/2024
Completed
$1,908,000
3/25/2024
$4,668,046
5/10/2024
$161,000
8/2/2024
Completed
Replace grit classifiers, gallery,
Blowers, piping/valves and other
components
$7,560,323
3/29/2025
Estimated completion
October 2026
Replace collector structure and
conveyance line to JB2, install 4
manholes
$1,287,012
4/21/2025
Replace Surge Arrestor system,
Pumps, Odor Control, and
electrical systems
$11M
October
2026
USST Valves and Piping
Replacement
Backup Pumps & Motors
Clean Grit Chambers
4 Backup Influent Pumps
Rehab Belt Filter Presses
#1-4
Hollister Street Pump
Station Repairs
Rehab Grit Facility
Replacement of Silva Drain
and conveyance lines to
JB2 & Replacement of Del
Sol Line
Rehab Hollister and Goats
Pump Station
For redundancy after TS Storm
Hilary
Emergency Maintenance due to
trash and sediment from excess
inflows from MX
For redundancy after TS Storm
Hilary
Rapid deterioration caused by
sand in sludge
Clean out surge tanks filled with
sediment and perform electrical
repairs
Total =
$45,944,795
Completed
Complete by Summer 2026
Completed
In progress
The beginning of the document. Download the full file to read on.
Other documents in this bid
- OM SBIWTP Services
- Attachment 2: FY26 SBIWTP O&M Quality Assurance Surveillance Plan
- Attachment 2: FY26 SBIWTP O&M Quality Assurance Surveillance Plan
- Attachment 4: Order No. as amended
- Attachment 4.a. GiantKelpVariance
- Attachment 5: List-of-Permits
- Attachment 5: List-of-Permits
- Attachment 7: FY26 IBWC Condition Assessment Report
- Attachment 12 2025 NPDES ANNUAL BIOSOLIDS REPORT
- Attachment 15: NIST SP.800-171r3
- Attachment 18: NIST FIPS.199
- Attachment 19: Statement of Objectives V2