Home / Core Research Program Technology Transfer &… / Document

Attachment 2: Project Deliverables

Updated

A Word document (32 KB) attached to Core Research Program Technology Transfer & Commercialization Advancement, from the Pipeline and Hazardous Materials Safety Administration. Due Nov 16, 2026, 5:00 PM (UTC-5).

File name: Attachment 2 - Project Deliverables 693JK326RA002.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SAMPLE SAMPLE SAMPLE SAMPLE

PROJECT DELIVERABLES

(12-MONTH ACCELERATED T2 PIPELINE)

Kick-Off & Technology Transfer Plan (TTP) Baseline (Month 3) Conduct Kick-Off Team and Technical Advisory Panel (TAP) meeting to establish commercial deployment targets, finalize sensor calibration protocols, and establish the baseline TRL transition plan. Results due to DOT/PHMSA within 3 months of the effective date of the Agreement. Benchtop Flow Loop Validation & Quantification Algorithm Calibration (Month 6) Conduct flow loop testing to validate sensor response times, spatial resolution, and false-alarm suppression, while calibrating algorithms for real-time leak rate quantification and mass-balance estimation. Results due to DOT/PHMSA within 6 months of the effective date of the Agreement. SCADA System Integration & Field Pilot Readiness (Month 9) Complete hardware package optimization, integrate leak detection and quantification software into operator SCADA/control system interfaces, and prepare field pilot test sites for operational demonstration. Results due to DOT/PHMSA within 9 months of the effective date of the Agreement. Field Pilot Demonstration, Operational Validation & TRL 7 Advancement (Month 11) Execute controlled field release testing on active/simulated pipeline segments to validate real-time leak localization, flow rate measurement accuracy, and multi-sensor reliability under real-world operating conditions (TRL 7). Results due to DOT/PHMSA within 11 months of the effective date of the Agreement. Standards Integration (Month 12)
Deliver finalized operator decision-support tools and establish guidelines for SDO integration (e.g., API 1130/1175, ASME). Due to DOT/PHMSA within 12 months of the effective date of the Agreement. Commercial Transition Strategy

Define the commercial licensing, manufacturing, and deployment roadmap for full market transition (TRL 8–9). Due to DOT/PHMSA within 12 months of the effective date of the Agreement. Final Reports (Month 12)
Prepare and submit all monthly progress reports, quarterly status reports, Final Project Report, Technology Transfer Brief, Final TRL Assessment, and TAP Peer-Review Reports. Due to PHMSA in accordance with the agreement. Market Outreach, Industry Conference & Technology Proliferation (Month 12) Prepare paper submissions, industry conference presentations (e.g., AMPP, IPC, or API pipeline conferences), and end-user workshop materials to drive broad industry adoption. Due to DOT/PHMSA within 12 months of the effective date of the Agreement.

The beginning of the document. Download the full file to read on.

Other documents in this bid