US Department of Agriculture (USDA)

Statement of Work
Solar Batteries Frenchman Work Center
Plumas National Forest

Project
Solar Batteries Frenchman Work Center
General Information

1.0 Scope of Work

The goal of this project is to replace the existing batteries in the Frenchman Work Center Solar System and recycle the old batteries.

2.0 Background

The Frenchman Work Center is a remote work center located in Plumas County. It consists of an Engine Bay building with offices and a barracks with a capacity to sleep 10. It supports a total of 6-15 fire personnel at any given time. Because it is a remote work center, it has no access to grid-tied electricity. Therefore, the work center solely functions off of a solar system with a back-up generator. The solar system has (14) lithium-ion batteries that have failed and no longer function thus the entire system cannot operate. The generator is a stand-by generator meant for short spans of use, not continuous duty. Therefore, immediate replacement of the batteries is needed.

3.0 Location

• 605 Frenchman Blvd, Chilcoot, CA 96105
• Lat/Long: 39.889927, -120.195959
• Elevation: ~5,650ft
• Note: This location does receive snow during the winter. Due to the instability of weather, coordination with COR required for delivery and installation to ensure site is properly accessible. 4.0 Estimated Start Date / Period of Performance
The period of performance is 30 calendar days following issuance of the Notice to Proceed. Start is expected immediately after contract award.

5.0 Drawings and Specifications

Reference Solicitation Attachments
• PNF Frenchman WC Solar Photos

6.0 Restrictions on Work

• Work hours are limited to non-holiday weekdays, Monday – Friday, 0600 – 1900, unless requested in writing and approved in advance by the COR at no additional cost to the Government. • Contractor is responsible for the security of their tools and equipment at all times • All trash and loose materials shall be secured by the contractor daily • All construction debris remains the property of the Contractor and shall be properly disposed of off National Forest Land

7.0 Camping and Housing

Camping within the construction limits may be permitted only with COR and District Ranger approval. Please provide request for camping in project bid proposal. Camping on Forest Service land is not a right; permission may be revoked for failure to comply with the terms of the permit.

8.0 Required Submittals

The following submittals are required:

The beginning of the document. Download the full file to read on.