SCOPE OF WORK

50’x100’x18’ Red Iron Storage Facility
MCAAP, Oklahoma 74501-9002

27 August 2026

1.0 PROJECT OVERVIEW

The Contractor shall provide all supervision, labor, materials, and equipment to perform the tasks defined in this scope of work and any included specifications, drawings, or other contract documents for the installation of the Storage facility. Contractor must coordinate all final measurements, material lists, construction documents and quantities needed with the Government prior to initiation of work.
All work shall be in accordance with reference drawings, Scope of Work (SOW), all applicable Codes and regulations, and any other data provided for technical requirements. The following description provided is general in nature and not all-inclusive in indicating the work necessary to complete the scope of work. It is the responsibility of the contractor to plan and provide the elements necessary for completion. Contractor will be on site along with government and any required sub-contractors to make final inspection and acceptance. This Scope of Work (SOW) outlines the requirements for the construction of a 50’x100’x18’ Red Iron Storage Facility and its associated site improvements, utilities, electrical distribution, communications, and security infrastructure. The contractor is responsible for executing all works in compliance with the work categories outlined below.
• Utility Clarification: Please note that MCAAP will execute all disconnects, reconnects, and terminations of all utilities. The contractor is responsible for coordination and preparation of pathways, trenching, and infrastructure up to the designated tie-in and termination points.

1.1 Pre-Construction, Permitting & Safety

1.1.1 Engineering & Site Analysis

• Geotechnical Analysis: The contractor shall perform a comprehensive geotechnical soil analysis at the construction site. This analysis must cover the building footprint, the proposed perimeter fence lines, and all planned road areas.
•

1.1.2 Permits & Regulatory Compliance

Excavation Permits: Secure all necessary Dig Permits and coordinate utility locates prior to any ground-breaking, trenching, or excavation activities. (Applies to site preparation, electrical, grounding, and fencing activities).

Job Hazard Analysis (JHA):
• All personnel must read, understand, and sign the Job Hazard Analysis (JHA) prior to starting any on-site work.
• The signed JHA must be maintained at the job site for the duration of the project and returned