US Army Corps
Of Engineers
Tulsa District

PATRIOT MISSILE STORAGE MAGAZINES

McAlester Army Ammunition Plant
McAlester, Oklahoma

PDC: 75350
FY: 10

IFB # W912BV-10-R-2011

CONTRACT NO. W912BV-XX-C-XXXX

AS BUILT

1-14-2011

USE GRAPHIC SCALE IF PRINTED BORDER IS OTHER THAN 16" X 10•"

U.S. ARMY CORPS

OF ENGINEERS

TULSA DISTRICT

Date

MGM
1-25-10

Appr.

120'

req't
mat'l
Clarify

Engineers
of

PLAN

GRADING

STORAGE

MISSILE

PATRIOT

Grading Plan
scale:

1" = 20'
Sheet
Reference
Number:

AS BUILT

1-14-2011

C2
Sheet

USE GRAPHIC SCALE IF PRINTED BORDER IS OTHER THAN 16" X 10•"

Symbol

No:

RFP/IFB

Branch
Design
Chief,

No.:
Contract

W912BV-10-C-2016

Harmon

Submitted:

Corps
Army
S.
U.

MAGAZINES

Reviewed:

MILLER

Walt Garner

OKLAHOMA

ARMY

ENGINEERS M.

DISTRICT

TULSA,

TULSA

:
FY
75350

Graded building site will be constructed by
the Government using select fill compacted to 98%
standard Proctor density and proof- rolled with
load of 20,000# per axle. The finished elevation
of the Government constructed building site will
be 12" above the original site and approximately
14" below desired finish floor elevation.
Finished graded gravel surface shall be a minimum
of 6" in thickness and constructed by the
contractor.

PDC:

2.

Army

Grade gravel to drain around and away from
buildings. (Each site is unique).

McAlester

1.

Oklahoma

J
C2 C3

Notes:

McAlester,

Ammunition

Plant

12'

Gravel road and drive by Government

DEPARTMENT

39'

OF

THE

'

CORPS OF

R

ARMY

l
a
c
i
p
y
t

U.S.

Designed:

Graded building site see note 2,

Stephen

Date:

1-14-2011

Plot
Code:
Drwg.

F-141-21-01

Name:

C2.dgn

File
Drawn:

M, MILLER

120'

Building location on site

W912BV-10-R-2011

K
C2 C3

Description

Type A base course,
see note 3 on sheet C3.

of 13

Notes:

Install 26 gauge liner panel from floor to
first girt (7-4 A.F.F. typical) after the
building insulation has been installed.

3.

Install 3-0x7-0 insulated steel door and
hollow metal frame. Provide hardware per
specifications. Paint door and frame to match
factory finish of coiling doors.

Install translucent wall panel from first girt
to eve. Install 8 panels in rear wall at quarter
poins in each bay and 2 in each end wall at third
points. Translucent panel profile shall match
wall panel. Protect panels from overspray during
insulation applications.

5.

Adjust building bay spacing to accommodate any
required portal frames or other structural
features as required by the building supplier.