Attachment 3: REFERENCE DRAWINGS- Red Iron Storage Facility
Updated
A PDF document (1.2 MB) attached to Minor Construction / Sustainability, Repair and Maintenance, from the Department of the Army. Due Nov 9, 2026, 5:00 PM (UTC-6).
File name: Attachment 0003 - REFERENCE DRAWINGS- 50x100x18 Red Iron Storage Facility.pdf
The full file is for paid members, or buy this bid alone.
Preview
US Army Corps
Of Engineers
Tulsa District
PATRIOT MISSILE STORAGE MAGAZINES
McAlester Army Ammunition Plant
McAlester, Oklahoma
PDC: 75350
FY: 10
IFB # W912BV-10-R-2011
CONTRACT NO. W912BV-XX-C-XXXX
AS BUILT
1-14-2011
USE GRAPHIC SCALE IF PRINTED BORDER IS OTHER THAN 16" X 10•"
U.S. ARMY CORPS
OF ENGINEERS
TULSA DISTRICT
Date
MGM
1-25-10
Appr.
120'
req't
mat'l
Clarify
Engineers
of
PLAN
GRADING
STORAGE
MISSILE
PATRIOT
Grading Plan
scale:
1" = 20'
Sheet
Reference
Number:
AS BUILT
1-14-2011
C2
Sheet
USE GRAPHIC SCALE IF PRINTED BORDER IS OTHER THAN 16" X 10•"
Symbol
No:
RFP/IFB
Branch
Design
Chief,
No.:
Contract
W912BV-10-C-2016
Harmon
Submitted:
Corps
Army
S.
U.
MAGAZINES
Reviewed:
MILLER
Walt Garner
OKLAHOMA
ARMY
ENGINEERS M.
DISTRICT
TULSA,
TULSA
:
FY
75350
Graded building site will be constructed by
the Government using select fill compacted to 98%
standard Proctor density and proof- rolled with
load of 20,000# per axle. The finished elevation
of the Government constructed building site will
be 12" above the original site and approximately
14" below desired finish floor elevation.
Finished graded gravel surface shall be a minimum
of 6" in thickness and constructed by the
contractor.
PDC:
2.
Army
Grade gravel to drain around and away from
buildings. (Each site is unique).
McAlester
1.
Oklahoma
J
C2 C3
Notes:
McAlester,
Ammunition
Plant
12'
Gravel road and drive by Government
DEPARTMENT
39'
OF
THE
'
CORPS OF
R
ARMY
l
a
c
i
p
y
t
U.S.
Designed:
Graded building site see note 2,
Stephen
Date:
1-14-2011
Plot
Code:
Drwg.
F-141-21-01
Name:
C2.dgn
File
Drawn:
M, MILLER
120'
Building location on site
W912BV-10-R-2011
K
C2 C3
Description
Type A base course,
see note 3 on sheet C3.
of 13
Notes:
Install 26 gauge liner panel from floor to
first girt (7-4 A.F.F. typical) after the
building insulation has been installed.
3.
Install 3-0x7-0 insulated steel door and
hollow metal frame. Provide hardware per
specifications. Paint door and frame to match
factory finish of coiling doors.
Install translucent wall panel from first girt
to eve. Install 8 panels in rear wall at quarter
poins in each bay and 2 in each end wall at third
points. Translucent panel profile shall match
wall panel. Protect panels from overspray during
insulation applications.
5.
Adjust building bay spacing to accommodate any
required portal frames or other structural
features as required by the building supplier.
The beginning of the document. Download the full file to read on.