NPS DSC Division 2 to 49 Specifications
National Park Service (NPS) - Denver Service Center (DSC) | 3-20-25
Table of Contents (TOC)
02 41 19
05 05 13
05 12 00
09 97 14
31 10 00
31 23 00
31 37 16
31 41 16.16
32 92 23
33 93 00
Selective Demolition
Hot-Dip Galvanization
Structural Steel
Protection of Buried Steel Bulkhead Tie Rods
Site Clearing
Excavation and Fill
Riprap
Synthetic Sheet Piling
Sodding
Exterior Plant
Digitally signed by Anirban
Bhadra
Date: 2026.09.30 12:37:20 -04'00'
Table of Contents (TOC) | NPS DSC Division 2 to 49 Specifications
STABILIZE KINGSLEY PLANTATION SHORELINE WITH SEAWALL EXTENSION
TIMU - 335507
CD
SECTION 02 41 19 – SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1
A.
1.2
DESCRIPTION
Section Includes:
1.
Demolition and removal of selected portions of structure.
2.
Demolition and removal of selected site elements.
3.
Salvage of existing items to be reused or recycled.
DEFINITIONS
A.
Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B.
Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse.
C.
Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D.
Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
E.
Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.
1.3
MATERIALS OWNERSHIP
A.
Unless otherwise indicated, demolition waste becomes property of Contractor.
B.
Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
1.
1.4
A.
Carefully salvage in a manner to prevent damage and promptly return to Owner.
PREINSTALLATION MEETINGS
Predemolition Conference: Conduct conference at Project site. 1.
Inspect and discuss condition of construction to be selectively demolished.
SELECTIVE DEMOLITION
024119-1
STABILIZE KINGSLEY PLANTATION SHORELINE WITH SEAWALL EXTENSION
TIMU - 335507
1.5
CD
2.
Review structural load limitations of existing structure.
3.
Review and finalize selective demolition schedule and verify availability of
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 4: Wage Determination Wage Determination
- Attachment 5: Vol I Exp
- Attachment 6: Vol I PastPerf
- Attachment 7: Vol II - GenRefs doc
- Attachment 8: Bid Bond
- Sol
- Sol Amendment 0001
- USACE NWP Permit 0002
- Attachment 5: Vol I Exp Updated 0002
- Attachment 6: Vol I PastPerf Updated 0002
- Sol Amendment 0002
- Attachment 11: Appendix C-Procedure for Environmental Protection 2026-10-22 Opt 0003