PROCEDURE FOR ENVIRONMENTAL PROTECTION
For contract work, the Contractor shall comply with all applicable Federal, State, or local laws and regulations. The environmental resources within the project boundaries and those affected outside the limits of permanent work under this contract shall be protected at least during the entire period of this contract. The Contractor shall confine their activities to areas defined by the drawings and specifications. Environmental protection requirements shall be implemented as described in the following subparagraphs.
1. General Project Environmental Design and Installation Criteria a. In order to minimize interaction with aquatic species and reduce sound propagation through the water, nearshore/shoreline activities including sheet pile installation, construction of riprap scour protection, and spartina plantings shall only be conducted during low tide conditions when the substrate is fully exposed. b. Work shall only be conducted during daylight hours.
c. Installation of synthetic sheet piles by impact or Vibratory hammer are limited to a maximum of 5 piles per day.
d. All construction personnel are responsible for observing water-related activities to detect the presence of these species and avoid them.
2. Permits and Authorizations
a. In addition to the procedures outlined in this appendix, the contractor shall comply with all terms and provisions of the Government Furnished Permits outlined in Division 1 Specification 01 31 00 PROJECT MANAGEMENT AND COORDINATION, Paragraph 1.9 B.
b. If compliance with the procedures in Appendix C conflicts with any terms or conditions of the Government Furnished Permits, the Contractor shall refer the provisions to the Contracting Officer for direction before proceeding. 3.
Wetland Protection Measures
a. The Contractor shall identify and avoid wetlands within the project area and adjacent to the project area as shown on the contract drawings, permit plans, and environmental compliance documents. The Contactor shall instruct all personnel associated with the project of the presence of wetlands if the wetlands are located within 1,000 feet of staging areas, access roads or any other areas used during construction activities.
b. There shall be no storage or stockpiling of equipment, tools, or materials within wetlands or along the shoreline within the littoral zone unless specifically authorized.
c. All construction personnel shall be advised that there are civil and criminal
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 2: TIMU Div 02 TO 49 Technical Specifications
- Attachment 4: Wage Determination Wage Determination
- Attachment 5: Vol I Exp
- Attachment 6: Vol I PastPerf
- Attachment 7: Vol II - GenRefs doc
- Attachment 8: Bid Bond
- Sol
- Sol Amendment 0001
- USACE NWP Permit 0002
- Attachment 5: Vol I Exp Updated 0002
- Attachment 6: Vol I PastPerf Updated 0002
- Sol Amendment 0002