Attachment 3 100P FinalCD Addendum 1

Updated

A PDF document (10.7 MB) attached to GRCA 257282 - Replace Wastewater Plant at South Ri, from the National Park Service. Due Nov 18, 2026, 1:00 PM (UTC-7).

File name: B08_Att_03_GRCA257282_100P_FinalCD_Addendum_1.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

National Park Service

Replace Wastewater Plant South Rim Village

GRCA-257282

100% Complete Construction Documents
Addendum 1
June 10, 2026

Prepared by:

Jacobs Government Services Company
Greenwood Village, CO
Contract No. 140P2023D0006
Task Order No. 140P2023F0235

GRCA 257282 – 100% Complete CD: Addendum 01

1.

Addendum Contents

This addendum address comments from NPS DCS review of 100% Final Construction Documents, dated June 2025, prepared for the Replace Wastewater Plant South Rim Village project. The comments resulted in minor updates to drawings, specifications and standard details. Revised documents are listed below and attached.

1.1

Revisions to Drawings

New or
Updated

Sheet
No.

DWG No.

Sheet Name

Description

Updated

1A

01G0001

WWTP Replacement

Revision Block

Updated

2A

01G0002

General Index of Drawings

Updated sheet numbers for drawing
revisions

Updated

3A

01G0003

General Index of Drawings

Updated sheet numbers for drawing
revisions

Updated

16A

01A0010

Architectural Code Data and
Life Safety Plan
Administration Building

Updated IBC reference from 2024 IBC
to 2021 IBC.

Updated

17A

01A0012

Architectural Code Data and
Life Safety Plan Maintenance
Building

Updated IBC reference from 2024 IBC
to 2021 IBC.

Updated

18A

01A0020

Architectural Code Data and
Life Safety Plan Headworks

Updated IBC reference from 2024 IBC
to 2021 IBC.

Updated

19A

01A0032

Architectural Code Data and
Life Safety Plan Process
Building

Updated IBC reference from 2024 IBC
to 2021 IBC.

Updated

20A

01A0080

Architectural Code Data and
Life Safety Plan Digester
Facility

Updated IBC reference from 2024 IBC
to 2021 IBC.

Updated

190A

10A6001

Administration Building
Architectural Schedules

Updated Sherwin Williams “Dover
Gray” to “Classic French Gray SW0077”

Updated

200A

10P9003

Administration Building
Plumbing Isometric

Corrected RW and W1 callouts.

Updated

220A

12A6001

Maintenance Building
Architectural Schedules

Updated Sherwin Williams “Dover
Gray” to “Classic French Gray SW0077”

Updated

253A

20A6001

Headworks Architectural
Schedules

Updated Sherwin Williams “Dover
Gray” to “Classic French Gray SW0077”

Jacobs Engineering Group Inc.

GRCA 257282 – 100% Complete CD: Addendum 01
Updated

311A

32A6001

Process Building Architectural Updated Sherwin Williams “Dover Schedules
Gray” to “Classic French Gray SW0077”

Updated

342A

70D3001

Reclaimed Water Tank
Mechanical Sections

Addition of non-potable water signage

Updated

357A

80A6001

Digester Facility Architectural
Schedules

Updated Sherwin Williams “Dover

The beginning of the document. Download the full file to read on.