Home / Dock-side (DS): USCGC WAESCHE Quarter 2 FY27 Repair / Document

Attachment 3: Consolidated List of References

Updated

A Word document (28 KB) attached to Dock-side (DS): USCGC WAESCHE Quarter 2 FY27 Repair, from the US Coast Guard. Due Dec 7, 2026, 12:30 PM (UTC-8).

File name: Attachment 3 Consolidated List of References.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

WAESCHE DS FQ2 FY27

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 26B-CB-IV-801-001, Rev -, Booklet of General Plans Coast Guard Drawing 35-LRI-II-801-001, Rev -, General Arrangement Coast Guard Drawing 418A-WMSL 100-006, Rev A, Inboard and Outboard Profiles Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements Coast Guard Drawing 418A-WMSL-167-006, Rev -, Stern Ramp Cofferdam Coast Guard Drawing 418A-WMSL-185-001, Rev A, Air Compressor and Receiver Foundation Installation Coast Guard Drawing 418A-WMSL-202-001, Rev C, Elex Dry Air Compressor Control Installation Coast Guard Drawing 418A-WMSL-320-013, Rev B, Elex Dry Air Compressor Power Installation Coast Guard Drawing 418A-WMSL-540-001, Rev C, Fuel Oil Diagram Coast Guard Drawing 418A-WMSL-540-002, Rev A, Diesel Eng and Gas Turb LO Fill, Trans, & Service Sys Coast Guard Drawing 418A-WMSL-551-001, Rev A, Compressed Air Diagram Coast Guard Drawing 418A-WMSL-551-003, Rev C, Elex Dry Air Compressor and Equipment Installation Coast Guard Drawing 418A-WMSL-556-007, Rev-, Stern Door Hydraulic Oil Cooler Install

Coast Guard Drawing 418A-WMSL-801-002, Rev A, Booklet of General Plans Coast Guard Drawing 750 WMSL-100-530, Rev G, Modifications incidental to the installation of Allied Dual Pont Davit Coast Guard Drawing 750-WMSL 536-001, Rev - THERMAL & ACOUSTIC INSULATION Coast Guard Drawing 750-WMSL-085-003, Rev A, Compartment Areas & Volumes NSC 1 & NSC 2 (Only) (ASC085012) Coast Guard Drawing 750-WMSL-100-011, Rev J, Unit 1110 Structure – Inner Bottom, 1st Platf & 2nd Deck – Bow to Fr 10 (ASC100111) Coast Guard Drawing 750-WMSL-100-013, Rev L, Unit 1210 Structure – Inner Bottom To 1st Platform – Fr 10 to Fr 22 (ASC100121) Coast Guard Drawing 750-WMSL-100-017, Rev L, Unit 1310 Structure – Inner Bottom to 1st Platform – Fr 22 to Fr 35 (ASC100131)

The beginning of the document. Download the full file to read on.

Other documents in this bid