Attachment 6: Government Property Report
Updated
A PDF document (132 KB) attached to Dock-side (DS): USCGC WAESCHE Quarter 2 FY27 Repair, from the US Coast Guard. Due Dec 7, 2026, 12:30 PM (UTC-8).
File name: Attachment 6 - Government Property Report.pdf
The full file is for paid members, or buy this bid alone.
Preview
ATTACHMENT 6
GOVERNMENT PROPERTY REPORT
The Contractor shall complete each column throughout the contract performance period with the assistance of the Government Property Administrator, as needed.
CONTRACT NUMBER:
CONTRACTOR POINT OF CONTACT:
VESSEL:
CONTRACTOR’S ADDRESS:
TELEPHONE NUMBER:
The chart below is for use during the performance of the above listed contract. The Contractor shall complete each column of the chart with the assistance of the Government Property Administrator, as needed.
TYPE OF PROPERTY RECEIVED
(INCLUDE NAME, DESCRIPTION ,
NSN AND SERIAL #)
NSN\SERIAL\P/N
DESCRIPTION
VALUE OF
PROPERTY
DATE
RECEIVED
DATE
INSTALLED/
CONSUMED
USE THIS BLOCK TO
RECORD :
1. CURRENT LOCATION
OF PROPERTY IN THE
POSSESSION OF THE
CONTRACTOR FOR USE
DATE
DISPOSITION
CARRIED OUT
DURING THE
AVAILABILITY OR
OTHERWISE BEING
TEMPORARILY HELD
UNTIL BEING RETURNED
TO/REINSTALLED ON
CUTTER.
2. DISPOSITION
INSTRUCTIONSFOR
UNUSED, SERVICEABLE,
SALVAGE OR SCRAP
PROPERTY. STATE
WHICH APPLY.
* Definitions (all property defined below will require disposition instructions): Serviceable - defined as property that was pre-existing in a location that was, during the course of performance, replaced and which will be turned in by the Coast Guard for future use.
Salvage – defined as property that has no serviceable value, but that has some value in excess of its scrap value. Scrap – defined as property having no value except for it basic material content. The undersigned hereby certify that all property provided under referenced contract has been accounted for. That is property has either been consumed in the performance of the contract or disposition instructions, as listed above, have been provided.
PROPERTY ADMINISTRATOR
DATE
CONTRACTOR SIGNATURE
DATE
(Sign at time disposition instructions are given)
(sign after execution of disposition instructions)
NOTE: The Contractor must carry out all disposition instructions as instructed above. This report must accompany the Contractor’s final invoice.
(07/02)
The beginning of the document. Download the full file to read on.