Attachment 3: Contractor Responsibility Verification
Updated
A PDF document (173 KB) attached to Rental of Uninterruptable Power Supply (UPS) System, from the Department of the Air Force. Due Nov 17, 2026, 2:00 PM (UTC-8).
File name: Attachment 3 - Contractor Responsibility Verification.pdf
The full file is for paid members, or buy this bid alone.
Preview
Contractor Responsibility Verification
RFO 9.103
(a) Award contracts to responsible prospective contractors only. (b) Do not award a contract award before making an affirmative determination of contractor responsibility. Without a clear indication of responsibility, make a determination of nonresponsibility. If the prospective contractor is a small business concern, comply with the subpart, Certificates of Competency and Determinations of Responsibility, at part 19. (c) A prospective contractor must affirmatively demonstrate its responsibility, including, when necessary, the responsibility of its proposed subcontractors. RFO 9.104
To be determined responsible, a prospective contractor must(a) Have adequate financial resources to perform the contract, or the ability to obtain them (see 9.1043(a)); (b) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments; (c) Have a satisfactory performance record (see 9.104-3 (b) and part 42). Do not determine a prospective contractor responsible or nonresponsible based solely on a lack of relevant performance history;
(d) Have a satisfactory record of integrity and business ethics (see part 42); (e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors) (see 9.104-3(a));
(f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them (see 9.104-3(a)); and
(g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations (see also inverted domestic corporation prohibition at 9.108).
For each factor, please provide the following information or submit supporting documentations as applicable in order to verify the Contractor’s Responsibility IAW RFO 9.104-1:
(a) FINANCIAL RESOURCES
Evidence that the contractor has financial resources to perform the contract such as Profit/Loss statement, most recent Balance Sheet, Available Line of Credit from a bank. Alternatively, the Offeror may provide a statement from their financial institution or a responsible company official on business letterhead confirming that the offeror currently has sufficient financial resources, or the
The beginning of the document. Download the full file to read on.