Attachment 3-Quote Schedule
Updated
A Word document (19 KB) attached to Mold remediation, Merritt Island NWR, from the Departmental Offices. Due Nov 16, 2026, 2:00 PM (UTC-5).
File name: Attachment_3-Quote_Schedule.docx
The full file is for paid members, or buy this bid alone.
Preview
Mold Remediation Services
Merritt Island National Wildlife Refuge Fire Office
Quote Schedule
Period of performance: Contract award – September 30, 2027 Description
Job
Total
Task 6.1 East and West Office North Walls
Task 6.2 West Office West Wall
Task 6.3 Attic Remediation
Task 6.4 HVAC Remediation and Flex-Duct Removal
Task 6.5 Temporary Humidity Control and Drying
Task 6.6 Cleaning and Antimicrobial Treatment
Task 6.7 Mold-Remediation Turnover Condition
Final Contractor Remediation Report
Total
* The Contractor shall provide all labor, supervision, licenses, materials, equipment, containment, temporary controls, transportation, disposal, testing support, and incidentals necessary to complete the mold-remediation scope. The Contractor shall not include reconstruction, replacement finishes, permanent moisture-source correction, window work, ceiling repair, plumbing repair, roofing work, or permanent HVAC replacement.
The beginning of the document. Download the full file to read on.