Attachment 3: Quote Schedule
Updated
A PDF document (125 KB) attached to Gray Wall Livestock Water Well, from the Bureau of Land Management. Due Oct 26, 2026, 12:00 PM (UTC-6).
File name: Attachment_3_Quote_Schedule.pdf
The full file is for paid members, or buy this bid alone.
Preview
Quote Schedule
Gray Wall Water Well
Item No.
Description
1 Drilling Well Hole (9.5" min. Dia.)
2 Install Contractor Furnished 5 inch PVC Casing
3 Install Contractor Furnished 5 inch Well Screen
4 Formation Stabilizer
5 Gravel Packing (.020 silica sand)
6 Install Contractor Furnished 8" steel protective casing
7 Well Development and Disenfection
8 Well Testing (Determine approximate yield)
9 Mobilization
LF = Linear Feet, AU = Job
Estimated Q Unit
150 LF
135 LF
20 LF
125 LF
20 LF
5 LF
3 Hour
2 Hour
1 AU
Unit Price
Bid
Total Amount
The beginning of the document. Download the full file to read on.