Home / Tonasket Ranger Station HVAC Replacement Building 2007 / Document

Attachment 3: RS HVAC Specifications

Updated

A PDF document (3.2 MB) attached to Tonasket Ranger Station HVAC Replacement Building 2007, from the Forest Service. Due Dec 3, 2026, 5:00 PM (UTC-8).

File name: C04_2_Attachment 3 RS HVAC Specifications.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

USDA Forest Service

Project Specifications

SECTION 00 01 01

COLVILLE NF

TONASKET RANGER STATION HVAC REPLACEMNT BUILDING #2007

A.

Tonasket Ranger Station HVAC Replacment Building #2007.

B.

1 W Winesap St, Tonasket, Washington 98855

C.

Phone:

509-486-2186

D.

Website:

Colville NF

https://www.fs.usda.gov/r06/colville

Offices

https://www.fs.usda.gov/r06/colville/offices

E.

Date:

06/26/2026.

END OF SECTION 00 01 01

9/10/2023

Tonasket Ranger Station HVAC Replacement Building #2007

Pg. 1/1

Project Title Page 00 01 01

USDA Forest Service

Project Specifications

SECTION 00 01 20

LIST OF SPECIFICATIONS

1. LIST OF SPECIFICATIONS

1.01

SPECIFICATIONS CONSIST OF THE FOLLOWING:

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 01 Project Title Page

00 01 20 List of Specifications

DIVISION 01 – GENERAL REQUIREMENTS

01 11 00 Summary of Work

01 23 00 Option Items

01 26 00 Contract Modification Procedures

01 29 00 Schedule of Values

01 31 00 Project Management and Coordination

01 32 00 Construction Progress Documentation

01 32 33 Photographic Documentation

01 33 00 Submittal Procedures

01 40 00 Quality Requirements

01 50 00 Temporary Facilities And Controls

01 60 00 Product Requirements

01 73 00 Execution

01 73 20 Selective Site Demolition

01 73 29 Cutting and Patching

01 74 19 Construction Waste Management and Disposal

01 77 00 Closeout Procedures

01 78 23 Operation and Maintenance Data

01 78 39 Project Record Documents

01 79 00 Demonstration and Training

DIVISION 23 – HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

23 01 30.51 HVAC Air-Distribution System Cleaning
23 05 13 Common Motor Requirements For HVAC Equipment
23 05 16 Expansion Fittings And Loops For HVAC Piping
23 05 17 Sleeves And Sleeve Seals For HVAC Piping
23 05 19 Meters And Gauges For HVAC Piping
23 05 23 General-Duty Valves For HVAC Piping
23 05 29 Hangers And Supports For HVAC Piping And Equipment 23 05 33 Heat Tracing For HVAC Piping
23 05 48 Vibration And Seismic Controls For HVAC
23 05 53 Identification For HVAC Piping And Equipment
9/10/2023

Tonasket Ranger Station HVAC Replacement Building #2007

Pg. 1-1/2

List of Specifications 01 01 20

USDA Forest Service

Project Specifications

23 05 66 Anti-Microbial Ultraviolet Emitters For HVAC Ducts And Equipment 23 05 93 Testing, Adjusting, And Balancing For HVAC

23 07 13 Duct Insulation

23 07 16 HVAC Equipment Insulation

23 07 19 HVAC Piping Insulation

23 08 00 Commissioning Of HVAC

23 09 13 Instrumentation And Control Devices For HVAC
23 09 23 Direct-Digital Control System For HVAC
23 09 34 Variable-Frequency Motor Controllers For HVAC

The beginning of the document. Download the full file to read on.

Other documents in this bid