National Park Service

Glen Canyon National Recreation Area – Bullfrog
Launch Ramp

Project Basis of Design
January 20, 2023

Prepared by:

Jacobs Government Services Company
Greenwood Village, CO
Contract No. 140P2021D0007
Task Order No. 140P2021F0391

GLCA Launch Ramps Design Criteria
January 20, 2022

GLCA Launch Ramps Design Criteria
Date: January 20, 2023

I.

Introduction
In partnership with the Park, and input from other stakeholders during early listening sessions, Jacobs developed site specific design criteria to address project needs for the launch ramp concept designs.

II.
Design Standards

1. Codes

a. Local Building Codes for Arizona and Utah
i. 2018 International Building Code (IBC 2018)
ii. Building Code requirements for Structural Concrete (ACI 318-14) b. Launch Ramp Materials
i. Concrete – Building Code requirements for Structural Concrete (ACI 318-14)
ii. Steel – American institute of Steel Construction Steel Manual (AISC-14) c. Ramp and Marina
i. California Boat Launching Facilities – Design Handbook ii. UFC 4-152-07 Design: Small Craft Berthing Facilities d. Roads
i. AASHTO Green Book (GDHS 2018)
ii. Park Road Standards – National Park Service 1984
e. Water System
i. Kane County Standard Specifications and Drawing Details for Design and Construction (2014)
ii. Utah Division of Drinking Water, Series 500 Rules, Drinking Water Facility Construction Design and Operation (2014)
iii. American Public Works Association (APWA)
iv. American Water Works Association (AWWA)
v. 2018 International Building Code (IBC 2018)
vi. International Fire Code (2021)
f. Sanitary Sewer System
i. Kane County Standard Specifications and Drawing Details for Design and Construction (2014)
ii. Uniform Plumbing Code (UPC 2021)
iii. 2018 International Building Code (IBC 2018)
g. Electrical and Communications Systems
i. National Electrical Safety Code (2023)
ii. National Electrical Code (2020)

JACOBS GOVERNMENT SERVICES COMPANY

GLCA Launch Ramps Design Criteria
January 20, 2022

h. ITA/EIA Standards
2. Loads (Dead, Live, Snow and Wind)
a. Seismic is not considered since for a slab on ground (without piles), the slab will move with the ground and there is not a structure period associated with it (different from pile-supported slab). b. However, seismic shear may need to be considered for the grade beams; further work required to confirm.
c. Load combinations (per Table 5.3.1 of ACI 318-14)
III. Environmental Conditions