Home / Building 215 Clean Room HEPA Filter Replacement / Document

Attachment 3: Specifications

Updated

A PDF document (1.9 MB) attached to Building 215 Clean Room HEPA Filter Replacement, from the National Institute of Standards and Technology. Due Nov 2, 2026, 2:00 PM (UTC-5).

File name: Attachment 3 - Specifications.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

NATIONAL INSTITUTE OF STANDARDS AND

TECHNOLOGY

GAITHERSBURG, MD, BUILDING 215

CLEANROOM REBALANCE

CLIN 0002

19W08375

Specifications
100% Release For Construction
June 29, 2021
BKM Project No.19146.01

MEP Engineer
Burdette, Koehler, Murphy &
Associates, Inc.
6300 Blair Hill Lane
Suite 400
Baltimore, MD 21209
P 410.323.0600
www.bkma.com

CLEANROOM REBALANCE

NIST

100% RELEASE FOR CONSTRUCTION

JUNE 29, 2021

DIVISION 01 – GENERAL CONDITIONS

011000

Summary

013100

Project Management and Coordination

013200

Construction Progress Documentation

013300

Submittal Procedures

014000

Quality Requirements

014200

References

015000

Temporary Facilities and Controls

015100

Project Construction Signage

016000

Product Requirements

017300

Execution

017700

Closeout Procedures

017823

Operation and Maintenance Data

017839

Project Record Documents

019113

General Commissioning Requirements

DIVISION 13 – SPECIAL CONSTRUCTION

130001

Clean Zone General Requirements

130002

Cleanroom Protocol

130003

Cleanroom Certification

DIVISION 23 – HVAC

230100

Basic HVAC Requirements

230200

Project Closeout - HVAC

230500

Basic HVAC Materials and Methods

TOC-1

CLEANROOM REBALANCE

NIST

100% RELEASE FOR CONSTRUCTION

JUNE 29, 2021

230510

HVAC Related Work

230514

Pipe, Tube and Fittings for HVAC Systems

230515

Piping Specialties for HVAC Systems

230519

Meters and Gauges for HVAC Piping

230523

Valves for HVAC Piping

230529

Hangers and Supports for HVAC Piping and Equipment

230548

Vibration Isolation for HVAC Piping and Equipment

230553

Identification for HVAC Piping and Equipment

230593

Testing, Adjusting and Balancing

230700

HVAC Insulation

230800

Commissioning of HVAC Systems

230900

Automatic Control Systems

232113

Hydronic Piping

232115

Hydronic Specialties

233113

Low Pressure Ductwork

233114

High Pressure Ductwork

233115

Laboratory Exhaust System

233300

Ductwork Accessories

233600

Air Terminals

233610

Exhaust Air Valve

233700

Air Outlets and Inlets

234000

Air Cleaning

TOC-2

CLEANROOM REBALANCE

NIST

100% RELEASE FOR CONSTRUCTION

JUNE 29, 2021

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1

RELATED DOCUMENTS

A.

1.2

Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

SUMMARY

A.

Section includes:
1.
2.
3.
4.

B.

Project information.
Work covered by Contract Documents.
Work restrictions.
Specification and drawing conventions.

Related Section:
1.

1.3

Division 01 Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Contracting Officer’s facilities.

The beginning of the document. Download the full file to read on.

Other documents in this bid