Attachment 3: Specifications
Updated
A PDF document (1.9 MB) attached to Building 215 Clean Room HEPA Filter Replacement, from the National Institute of Standards and Technology. Due Nov 2, 2026, 2:00 PM (UTC-5).
File name: Attachment 3 - Specifications.pdf
The full file is for paid members, or buy this bid alone.
Preview
NATIONAL INSTITUTE OF STANDARDS AND
TECHNOLOGY
GAITHERSBURG, MD, BUILDING 215
CLEANROOM REBALANCE
CLIN 0002
19W08375
Specifications
100% Release For Construction
June 29, 2021
BKM Project No.19146.01
MEP Engineer
Burdette, Koehler, Murphy &
Associates, Inc.
6300 Blair Hill Lane
Suite 400
Baltimore, MD 21209
P 410.323.0600
www.bkma.com
CLEANROOM REBALANCE
NIST
100% RELEASE FOR CONSTRUCTION
JUNE 29, 2021
DIVISION 01 – GENERAL CONDITIONS
011000
Summary
013100
Project Management and Coordination
013200
Construction Progress Documentation
013300
Submittal Procedures
014000
Quality Requirements
014200
References
015000
Temporary Facilities and Controls
015100
Project Construction Signage
016000
Product Requirements
017300
Execution
017700
Closeout Procedures
017823
Operation and Maintenance Data
017839
Project Record Documents
019113
General Commissioning Requirements
DIVISION 13 – SPECIAL CONSTRUCTION
130001
Clean Zone General Requirements
130002
Cleanroom Protocol
130003
Cleanroom Certification
DIVISION 23 – HVAC
230100
Basic HVAC Requirements
230200
Project Closeout - HVAC
230500
Basic HVAC Materials and Methods
TOC-1
CLEANROOM REBALANCE
NIST
100% RELEASE FOR CONSTRUCTION
JUNE 29, 2021
230510
HVAC Related Work
230514
Pipe, Tube and Fittings for HVAC Systems
230515
Piping Specialties for HVAC Systems
230519
Meters and Gauges for HVAC Piping
230523
Valves for HVAC Piping
230529
Hangers and Supports for HVAC Piping and Equipment
230548
Vibration Isolation for HVAC Piping and Equipment
230553
Identification for HVAC Piping and Equipment
230593
Testing, Adjusting and Balancing
230700
HVAC Insulation
230800
Commissioning of HVAC Systems
230900
Automatic Control Systems
232113
Hydronic Piping
232115
Hydronic Specialties
233113
Low Pressure Ductwork
233114
High Pressure Ductwork
233115
Laboratory Exhaust System
233300
Ductwork Accessories
233600
Air Terminals
233610
Exhaust Air Valve
233700
Air Outlets and Inlets
234000
Air Cleaning
TOC-2
CLEANROOM REBALANCE
NIST
100% RELEASE FOR CONSTRUCTION
JUNE 29, 2021
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1
RELATED DOCUMENTS
A.
1.2
Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
SUMMARY
A.
Section includes:
1.
2.
3.
4.
B.
Project information.
Work covered by Contract Documents.
Work restrictions.
Specification and drawing conventions.
Related Section:
1.
1.3
Division 01 Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Contracting Officer’s facilities.
The beginning of the document. Download the full file to read on.