C. DESCRIPTION/ SPECIFICATIONS/ STATEMENT OF WORK
C.1 Scope of Work
Description of Work:
The purpose of this contract is to obtain the services of a General Contractor to perform general maintenance, repair, and construction work on various Government-owned buildings across the Inyo National Forest. The buildings to be repaired include housing facilities, administrative buildings, barracks, storage buildings, and the construction of new trailer pads with associated utilities. The work involves multiple trades, including but not limited to demolition, earthwork, concrete, carpentry, roofing, painting, plumbing, and electrical. All work shall conform to the requirements of this Statement of Work and the attached Technical Specifications.
A detailed list of all required work, including specific building locations, tasks, and quantities, is provided in the Schedule of Work.
Work associated with this contract includes, but is not limited, to the following categories. All work shall be performed in accordance with the attached Technical Specifications. 1. Painting: This involves exterior and interior painting of housing facilities, administrative buildings, and storage buildings, including repairs to surfaces like drywall and siding. 2. Roofing: This involves the repair or replacement of existing roofs, replacement of damaged vent stacks, and installation of new gutters.
3. Carpentry: This includes the repair or replacement of decks, stairs, cabinetry, countertops, and shelving, as well as the installation of new windows and doors. 4. Flooring: This involves the removal of existing flooring and the installation of new materials such as commercial-grade carpet or Luxury Vinyl Plank (LVP).
5. Plumbing: This includes the replacement of interior fixtures (toilets, sinks, faucets) and the repair or installation of exterior underground water and sewer lines. 6. Electrical: This includes the installation of new interior lighting and the installation of new electrical service pedestals for trailer pads.
7. Site Work: This includes the construction of new reinforced concrete trailer pads and the repair of concrete walkways.
8. Specialty Work: This includes the installation of pellet stoves, ventilation equipment (bath fans, range hoods), and pest exclusion measures.
Project Expectations:
1. The Contractor shall submit a detailed project timeline to the Contracting Officer's Representative (COR) no later than two (2) weeks after the contract award.