Attachment 5: Schedule of Work
Updated
A PDF document (298 KB) attached to GAOA Facilities, Barracks Inyo NF, from the Forest Service. Due Nov 6, 2026, 12:00 PM (UTC-7).
File name: Attachment 5 Schedule of Work.pdf
The full file is for paid members, or buy this bid alone.
Preview
Inyo National Forest, Facilities Improvement Project
Building Name / Location
Mt. Whitney Barracks
Task Description
Exterior Painting: Includes all surface preparations, siding and drywall repairs.
Unit
Quantity
SF
2000
Lone Pine, CA
Interior Painting: .Includes all surface preparations and drywall repairs.
SF
2000
Paint and Repair Main Entrance Ramp: Includes sanding and preparing ramp surfaces for painting. Wooden ramp & Metal railing).
Replace Bathroom Sinks: Replace existing sinks, including vanity.
LS
LS
Replace Back Stairs: Existing stairs are made of Doug Fir, approximately 4ft x 4ft replace-kind.
LS
Replace Kitchen Counter: Existing sink is approximately 24 inch by 72 inch (Laminate, Formica), replace inkind. Install New Bathroom Fan/Light Combo: Replace existing light and vent, with new fan/light combo. Must be vented to exterior.
Replace Ceiling Tiles: Existing ceiling tiles are made of Mineral Fiber, replace-kind.
LS
LS
SF
1600
Roof Replacement: Existing roof is made of composite shingles, replace in-kind.
SF
1600
Unit
Quantity
SF
1700
Building Name / Location
Mt. Whitney House
Task Description
Exterior Painting: Includes all surface preparations, siding and drywall repairs.
Lone Pine, CA
Interior Painting: .Includes all surface preparations and drywall repairs.
SF
1700
Remove Wood Stove: Includes drywall repair and ceiling/roof penetration repairs. Replace Kitchen Counter: Existing sink is approximately 24 inch by 72 inch (Laminate, Formica), replace inkind. Replace Double Sink
LS
LS
LS
Replace Faucet
LS
Install New Bathroom Fan/Light Combo: Replace existing light and vent, with new fan/light combo. Must be vented to exterior.
LS
Schedule of Work
Inyo National Forest, Facilities Improvement Project
Building Name / Location
Helitack Barracks
Task Description
Exterior Painting: Includes all surface preparations, siding and drywall repairs.
Unit
Quantity
SF
2000
Independence, CA
Interior Painting: .Includes all surface preparations and drywall repairs.
SF
2000
Replace Sink (Westside): Wall attachment sink, replace in-kind. Includes plumbing repairs. Replace Kitchen Counter: Existing counter is approximately 24 inch by 96 inch (Laminate, Formica), replace in-kind.
Replace Double Sink
LS
LS
LS
Replace Faucet
LS
Replace Vent Hood: Replace in-kind.
Install New Bathroom Fan/Light Combo: Replace existing light and vent, with new fan/light combo. Must be vented to exterior.
Paint Main Entrance Stairs and Backdoor Stairs: Existing wooden stairs are approximately 4ft x 4ft.
LS
LS
LS
The beginning of the document. Download the full file to read on.