Attachment 3: Supply Chain Market Checklistv2
Updated
A PDF document (791 KB) attached to Mobile Tactical Cannon - Tracked (MTC-T) and Resupply Vehicle – Tracked (RSV-T) Capability Solutions, from the Department of the Army. Due Nov 16, 2026, 3:00 PM (UTC-5).
File name: Attachment 003 - Supply Chain Market Checklistv2.pdf
The full file is for paid members, or buy this bid alone.
Preview
Supply Chain – Market Check
PdM SPH-M is requesting additional deliberate information on current supply system provisioned US and NATO NSN assignment and parts available within the stock supply system. Identify how many parts are common with and what current US Military systems are they common with. (example text is in blue) -
Total number/percentage of Integrated vehicle US Stock Supply NSNs assigned = number/XX% Total number/percentage of Integrated vehicle NATO Stock Supply NSNs assigned = number/XX% Total current number/percentage of Commercial of the Shelf (COTS) parts for vehicle system=number/XX% Total Vehicle parts =
Describe US-based supplier base (if applicable)—please provide CAGE codes if needed Commonality of parts with fielded US platforms
PROVISIONED PARTS (example) US NSN
PROVISIONED PARTS (example) NATO
NSN
Commercial Off The Shelf (COTS)
JLTV
3600
11%
3600
2%
1000
3600
28%
D
R
Commonality with US Fielded Platforms
Stryker (example)
%
Number of US suppliers
VARIANT
Total Vehicle Parts
AF
ALL
Quantity
T
Vehicle Name
TOTAL PARTS
Common Parts
% Common
Parts with NSN
Common Parts
% Common
Parts with NATO NSN
Common Parts
% Common
%
PLS
Etc.
Based on existing provisioning data, this example of supply system parts commonality above was created Distribution Statement A. Approved for public release: distribution is unlimited.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Appendix A - Project Articles
- Appendix B - Project Other Terms and Conditions
- Appendix C - Representations and Certifications
- Attachment 1: Contract Data Requirements Lists (Contract Data Requirements List)
- Attachment 9: Proof Gun system Overview Distro A - Embedded video 1
- Attachment 14: Petroleum Oils and Lubricants Guide
- Attachment 16: MTC Sample Special License Agreement
- MTC-T OTA Prototype Project Agreement
- MTC-Tracked Call for Solutions