Home / Solicitation - Repair of the C-5 Automated Flight Control… / Document

Attachment 4: CAV AF Reporting Requirements

Updated

A PDF document (302 KB) attached to Solicitation - Repair of the C-5 Automated Flight Control System Panel (AFCSP) and Communication/Navigation Panel (CNP), from the Department of the Air Force. Due Nov 18, 2026, 4:00 PM (UTC-5).

File name: Attachment 4 - CAV AF Reporting Requirements.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Commercial Asset Visibility Air Force

CAV AF REPORTING REQUIREMENTS

The purpose of this attachment is to provide Contract Depot Maintenance (CDM) guidance for contractor technical responsibilities and reporting requirements of the CAV AF system. CAV AF is the mandated primary system of record for providing daily status of all Government owned assets located at contractor repair facilities. Reporting within CAV AF is not limited to end items subject to repair, but includes assets stored within a contractor Inventory Control Point (ICP). CAV AF system down-time will be identified on the CAV AF homepage banner. Contractors are responsible for ensuring the most current Contractor User Guides are utilized by their assigned reporters.
NOTE: Contractor User’s Guide can be accessed from the CAV AF homepage.

CAV AF FAMILIARIZATION TRAINING

1. Familiarization training for CAV AF reporting can be requested by the contractor via the applicable contracts ICP CAV AF system administrator (SA). Assistance, guidance, general questions or specific contract transactional reporting requirements can be addressed to the CAV AF contract monitor (CM). ICP CAV AF (SA and/or CM) points of contact (See Contractor Responsibility Item #4).

CONTRACTOR RESPONSIBILITY

1. Contractor shall ensure asset record in CAV AF is an accurate reflection of physical assets on hand at all times. This shall be accomplished via CAV AF reporting daily and/or within one (1) business day of a maintenance action occurrence IAW the applicable CAV AF CDRL. NOTE: A valid Public Key Infrastructure (PKI) is required prior to accomplishing #2 and #3 of contractor responsibilities.
2. Each CAV AF reporter shall submit a completed System Authorization Access Request, DD Form 2875, per instructions within 10 days after contract award date. All DD Form 2875(s) shall be digitally signed. There must be two CAV AF reporters assigned to ensure contractual reporting requirements do not experience a lapse in reporting coverage. 3. Reporter(s) shall complete initial and annual refresher DoD Information Assurance (IA) CyberAwareness Challenge training and submit a course completion certificate with the completed DD Form 2875.
a. Reporter(s) can access IA training on the CyberAwareness Challenge website, using the following website: https://public.cyber.mil/training/cyber-awareness-challenge b. After navigating to training simply “Launch Training”.

CAV AF Reporting Requirements, v7, December 2023, page 1

c. First time CAV AF Reporter(s) will email initial IA CyberAwareness Challenge course

The beginning of the document. Download the full file to read on.

Other documents in this bid