Attachment 4: Construction Schedule

Updated

A Word document (21 KB) attached to GCI Pollyanna #2 Acid Mine Drainage Remediation Pr, from the Office of Surface Mining, Reclamation and Enforcement. Due Nov 6, 2026, 5:00 PM (UTC-5).

File name: ATTACH_4_-_Construction_Schedule.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Date:

Feature
Item
Day:
Pollyanna 2
Mobilization

Clearing and Grubbing

Pond Dewatering

Earth Fill / Dirt Work

HDPE 8” Collection Pipe

Concrete for Flow Spreader(s), Seep Step, and Installment

High Calcium Limestone (AASHTO #3)

Dosing Siphon Concrete Vault

10” Dosing Siphon

Settling/Oxy Pond Appurtenances: Two 4-inch Outlet Pipes, two 2.5/3-inch Orifice Plates, & Baffle Curtains 6: 50ft long x 3ft tall

Wetland Seeding and Planting

Permanent Erosion Control

Fencing (5-wire)

Removal of Equipment and Associated Tanks

Earth Fill / Dirt Work

HDPE 8” Collection Pipe

Concrete for Flow Spreader(s), Seep Step, and Installment

Add more pages as seem fit

The beginning of the document. Download the full file to read on.