Attachment 4: Construction Schedule
Updated
A Word document (21 KB) attached to GCI Pollyanna #2 Acid Mine Drainage Remediation Pr, from the Office of Surface Mining, Reclamation and Enforcement. Due Nov 6, 2026, 5:00 PM (UTC-5).
File name: ATTACH_4_-_Construction_Schedule.docx
The full file is for paid members, or buy this bid alone.
Preview
Date:
Feature
Item
Day:
Pollyanna 2
Mobilization
Clearing and Grubbing
Pond Dewatering
Earth Fill / Dirt Work
HDPE 8” Collection Pipe
Concrete for Flow Spreader(s), Seep Step, and Installment
High Calcium Limestone (AASHTO #3)
Dosing Siphon Concrete Vault
10” Dosing Siphon
Settling/Oxy Pond Appurtenances: Two 4-inch Outlet Pipes, two 2.5/3-inch Orifice Plates, & Baffle Curtains 6: 50ft long x 3ft tall
Wetland Seeding and Planting
Permanent Erosion Control
Fencing (5-wire)
Removal of Equipment and Associated Tanks
Earth Fill / Dirt Work
HDPE 8” Collection Pipe
Concrete for Flow Spreader(s), Seep Step, and Installment