Revised Channel-Pond Dosing Siphon Plan View 0001

Updated

A PDF document (3.8 MB) attached to GCI Pollyanna #2 Acid Mine Drainage Remediation Pr, from the Office of Surface Mining, Reclamation and Enforcement. Due Nov 6, 2026, 5:00 PM (UTC-5).

File name: REVISED_Channel-Pond_Dosing_Siphon_Plan_View_(1)_0001.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

DATE

3.6"
24"

3'

1ft
6ft

36.00 SQ Ft

1.5 cy (each) at 12'x10"x 3'

Channel Flow Spreader

TOP OF BERM EL. 727.00'

TOP OF ROCK EL. 724.50'

GENERAL NOTES:

BOTTOM OF POND EL. 720.50'

150.00'
158.00'

SECTION A - A' FLB POND

MATCH PROPOSED GRADES

BOTH SIDES

Concrete:
Fc 3,500 psi Type II
Bevel all exposed edges of the concrete with 3/4"
triangular molding. Broom finish.

TOP OF BERM EL. 727.00'

TOP OF ROCK EL. 724.50'

MATCH PROPOSED GRADES

BOTH SIDES

BOTTOM OF POND EL. 720.50'

90.00'
98.00'

SECTION B - B' FLB POND

B

Steel Reinforcement:
Welded Wire Mesh (WWM) shall be place in the
center of each the 10" steps of the Seep Spreader
leaving 3" of clearance to all edges.

158.00'

The Channel Flow Spreaders will have one WWM
placed in the center of 10" wall leaving 3" of
clearance to all edges.

150.00'

98.00'

90.00'

A

A'

GCI PERMIT NO. 4105

POLLYANNA #2 AMD

LATIMER COUNTY, OK

EPS

12'

FLB Auxillary Spillway - 6.50 SQ Ft x 30LF = 7CY x 1.5 ton/cy = 11 ton

MRB

EPS

DESIGN BY:

1ft
6ft

CHKD. BY:

OXI Pond Outlet Channel - 6.50 SQ Ft x 210LF = 51CY x 1.5 ton/cy = 76 ton

NO.

5.75 SQ Ft

9 cy at 40 ft

Seep Spreader

DRAWN BY:

1ft

6ft

REVISIONS

Wetland Outlet Channel - 6.50 SQ Ft x 50LF = 12CY x 1.5 ton/cy = 18 ton

DESCRIPTION

10"

2ft

Office of Surface Mining Reclamation
and Enforcement
U.S. Department of the Interior
Tulsa Field Office

1 West 3rd Street, Suite 1600

Tulsa, Oklahoma 74103-3521

6ft

DWN.

FLB Channel - 14.00 SQ Ft x 450LF = 233.33 CY x 1.5 ton/cy = 350 ton

CHANNEL AND

POND DETAILS

PLAN VIEW OF FLB

FILE: GCI # 2

ISSUE DATE

8/5/2026
DRAWING NO.

B'

DOSING SIPHON

DETAIL

ISSUE DATE

FILE: GCI # 2

DRAWING NO.

8/5/2026

GCI PERMIT NO. 4105

POLLYANNA #2 AMD

LATIMER COUNTY, OK

Office of Surface Mining Reclamation
and Enforcement
U.S. Department of the Interior
Tulsa Field Office

1 West 3rd Street, Suite 1600

Tulsa, Oklahoma 74103-3521

EPS

CHKD. BY:

MRB

DRAWN BY:

EPS

DESIGN BY:

NO.

REVISIONS

DESCRIPTION

DWN.

DATE

4+00

732 33

73 731'

1+00

3+00

1+45.76
1+48.59
2+00.00

1+

568379.69
568380.37
568380.99
568392.26

568407.41
568425.94

2728134.31
2728135.41
2728136.54
2728137.72
2728138.92
2728140.17
2728141.44
2728166.13

2728184.96
2728205.45

2728263.94

4+00.00

568524.56

2728346.20

4+30.89

568511.30

2728372.05

4+70.28

568519.86

568515.93
568475.24

2728334.37

2728368.85

2728387.90

8'

Easting
2727684.87
2727735.48
2727786.10
2727804.18
2727804.18
2727804.18

PLAN VIEW AND

GENERAL

LAYOUT

The beginning of the document. Download the full file to read on.