U.S DEPARTMENT OF AGRICULTURE NATIONAL CENTER FOR AGRICULTURAL

UTILIZATION RESEARCH

1815 NORTH UNIVERSITY STREET PEORIA, IL 61604

NCAUR REPAIR BUILDING SYSTEMS

INDEX - GENERAL

G000
G001

GENERAL PROJECT NOTES

VICINITY LOCATION MAP

COVER SHEET

OVERALL PLAN

1.

THE CONTRACTOR SHALL COORDINATE, SCHEDULE, TEST AND PROVIDE ANY EFFORT NECESSARY TO RESULT IN A COMPLETE AND OPERATING SYSTEM.

MECHANICAL

2.

DETAILS SHOWN ARE INDICATIVE OF THE CHARACTER, PROFILES, MATERIAL, AND SYSTEMS REQUIRED FOR THE WORK. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, LABOR, SUNDRIES, TESTING AND REPORTING TO PROVIDE A COMPLETE AND OPERATIONAL SYSTEM. THE CONTRACTOR SHALL INCLUDE THOSE CONDITIONS NOT COVERED BY SPECIFIC DETAILS.

3.

WHERE THE DESIGN INTENT CANNOT BE DETERMINED FROM THE DRAWINGS OR SPECIFICATIONS, CONSULT THE CONTRACTING OFFICER'S REPRESENTATIVE BEFORE PROCEEDING WITH THE WORK.

4.

FIELD VERIFY ALL CONDITIONS & DIMENSIONS BEFORE PROCEEDING WITH THIS WORK. IF CONDITIONS VARY FROM INFORMATION WITHIN THE CONTRACT DOCUMENTS, CONSULT THE ARCHITECT OR ENGINEER BEFORE PROCEEDING WITH THE WORK.

5.

THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE OF ANY AND ALL DISCREPANCIES BETWEEN THE CONTRACT DOCUMENTS AND EXISTING CONDITIONS PRIOR TO PROCEEDING WITH THE WORK. PROVIDE RFI'S DURING COORDINATION DRAWING EFFORT TO AVOID FIELD REVISIONS.

6.

PROVIDE COMPLETE AND OPERATONAL SYSTEMS TO UPGRADE ELECTRIC VAULT 1, ELECTRICAL VAULT 6, AND THE STEAM CODENSATE SYSTEM.

7.

ALL PENETRATIONS OF ROOF AND FIRE RATED WALL OR SMOKE PARTITIONS SHALL BE PATCHED & REPAIRED AS REQUIRED TO MAINTAIN THE EXISTING FIRE RATING OR SMOKE INFILTRATION INTEGRITY OF THE FLOOR AND WALL. ALL SLEEVES, WIREWAYS, CABLE TRAYS, PIPES, DUCTWORK, ARE TO BE FIRE SEALED TIGHT TO THE WALL OR FLOOR PENETRATIONS TO MAINTAIN THE REQUIRED CODE COMPLIANT FIRE RATING.

8.

THE CONTRACTOR IS RESPONSIBLE FOR THE TIMELY REMOVAL OF ALL DEMOLITION DEBRIS AND PROTECTION OF EXISTING AREAS WHICH ARE NOT AFFECTED BY THE SCOPE OF WORK. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE OF ANY INCIDENTAL DAMAGE ASSOCIATED WITH THEIR EFFORTS. ANY DAMAGE TO THE PREMISES SHALL BE BROUGHT BACK TO ORIGINAL CONDITION AT THE COST OF THE GENERAL CONTRACTOR OR SUBCONTRACTOR INFLICTING THE DAMAGE. RUBBISH SHALL BE REMOVED DAILY AT THE END OF EACH SHIFT.

9.

CONTRACTOR RESPONSIBLE FOR PROTECTING EXISTING WALL, CEILING, AND FLOOR FINISHES DURING CONSTRUCTION. REPAIR ANY DAMAGES RESULTING FROM THIS PROJECT AT NO ADDITIONAL COST TO THE OWNER.