Home / Repair Building Systems (Peoria, IL) / Document

Attachment 5: DOL

Updated

A PDF document (46 KB) attached to Repair Building Systems (Peoria, IL), from the Agricultural Research Service. Due Dec 2, 2026, 12:00 PM (UTC-6).

File name: C04 Attachment 5 DOL IL20260003_2026_05_18.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

"General Decision Number: IL20260003 05/18/2026
State: Illinois
Construction Types: Building and Residential
Counties: Illinois Counties of
Peoria and Tazewell

BUILDING CONSTRUCTION PROJECTS

RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)
Modification Number

Publication Date
01/02/2026
05/18/2026

BOIL0060-002 01/01/2025

Rates
---------------------------------------------------------------BRIL0006-006 06/01/2021

Rates
---------------------------------------------------------------BRIL0006-013 06/01/2021

Rates

MARBLE & TILE SETTER AND TERRAZZO WORKER (PEORIA

---------------------------------------------------------------BRIL0006-014 06/01/2021

Rates

BASE MACHINE MEN: BASE MACHINE OPERATOR (PEORIA AND

---------------------------------------------------------------CARP0237-011 05/15/2020

Rates

CARPENTER: RESIDENTIAL (PEORIA AND TAZEWELL

CARPENTER, BUILDING: PILEDRIVERMAN (PEORIA AND

CARPENTER, BUILDING: JOURNEYMAN (PEORIA AND

---------------------------------------------------------------CARP1051-002 05/15/2020

Rates
---------------------------------------------------------------ELEC0034-004 03/01/2022

Fringes
32.76

Fringes
24.47

Fringes
24.48

Fringes
24.46

Fringes
29.10
29.10
29.10

Fringes
29.97

Rates
---------------------------------------------------------------ELEC0034-004 03/01/2025

Rates
---------------------------------------------------------------ELEV0055-002 01/01/2025

Rates

ELEVATOR MECHANIC

FOOTNOTES: A) EMPLOYER

CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS

VACATION PAY CREDIT FORE EMPLOYEES WITH MORE THAN 5

YEARS OF SERVICE; AND 6% FOR 6 MONTHS TO 5 YEARS OF

SERVICE

B) PAID HOLIDAYS: NEW YEAR'S DAY;
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY;

THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING

---------------------------------------------------------------ENGI0649-003 04/01/2025

Rates
OPERATOR: POWER EQUIPMENT: GROUP 3 AIR COMPRESSOR;
HERMAN NELSON HEATER, DRAVO, WARNER, SILENT GLO,
AND SIMILAR TYPES; WATER PUMP(S); LIGHT PLANTS;
GENERATORS; WELDING MACHINES; POWER SUBGRADER;
STRAIGHT TRACTOR; TRAC AIR WITHOUT ATTAHMENTS;
ROLLER: FIVE (5) TON AND UNDER ON EARTH OR GRAVEL;

FORM GRADER; CRAWLER CRANE, SKID RIG OILERS &

OILERS WITH CDL; CONVEYOR (1) OR (2); MIXER (3) BAG

AND UNDER(STANDARD CAPACITY WITH SKIP); BULK CEMENT

PLANT; OILER ON CENTRAL CONCRETE MIXING PLANT; STUD

OPERATOR: POWER EQUIPMENT: GROUP 2 DINKEYS; POWER

LAUNCHES; PH ONE-PASS SOIL-CEMENT MACHINE (AND

The beginning of the document. Download the full file to read on.

Other documents in this bid