Home / GAOA Brainard Lake Recreation Area Deferred Maintenance / Document

Attachment 4: Plans

Updated

A PDF document (9.1 MB) attached to GAOA Brainard Lake Recreation Area Deferred Maintenance, from the Forest Service. Due Dec 17, 2026, 3:00 PM (UTC-7).

File name: C04d Attachment 4 Plans 1240LT27Q0004.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

UNITED STATES DEPARTMENT OF AGRICULTURE

FOREST SERVICE

ROCKY MOUNTAIN REGION

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

ARAPAHO & ROOSEVELT NATIONAL FORESTS

& PAWNEE NATIONAL GRASSLAND

R2

ROCKY MOUNTAIN REGION

BOULDER RANGER DISTRICT

WARD, COLORADO

BRAINARD LAKE RECREATION AREA

DEFERRED MAINTENANCE

PHASE #1 RECREATION SITE IMPROVEMENTS

NIWOT TRAILHEAD

PROJECT

LOCATION

NO.

PROJECT MANAGER

INDEX

DATE

SHEET # SUB-SHEET

signed by KAMBER HURST BOX
KAMBER HURST BOX Digitally
Date: 2026.06.10 14:15:44 -06'00'

FOREST ENGINEER

DATE

THESE DRAWINGS COMPLY WITH THE FOREST PLAN AND PROJECT

SPECIFIC NEPA DOCUMENTATION:

signed by KEVIN MCLAUGHLIN
KEVIN MCLAUGHLIN Digitally
Date: 2026.06.17 11:49:38 -06'00'

DISTRICT RANGER

DATE

Digitally signed by CHRISTOPHER

STUBBS

Date: 2026.06.23 14:41:16 -06'00'

FOREST SUPERVISOR

DATE

RECOMMENDED BY:

KODY NATHE

Digitally signed by KODY NATHE
Date: 2026.06.24 15:01:27 -06'00'

ENGINEERING/REGIONAL SPECIALIST [FSP MANAGER]

NIWOT

TRAILHEAD

DATE

APPROVED BY:

Digitally signed by CHRISTOPHER

CHRISTOPHER MURPHY MURPHY

Date: 2026.06.26 09:33:24 -06'00'

REGIONAL ENGINEER

DATE

GAOA - BRAINARD LAKE

DEFERRED MAINTENANCE

PHASE #1 - RECREATION

SITE IMPROVEMENTS

(UPDATED)

I HAVE REVIEWED THE TECHNICAL ASPECTS OF THESE DRAWINGS:

Digitally signed by JARED SMITH
Date: 2026.06.15 09:36:57 -06'00'

REVISION / ISSUE

DATE

PROJECT LOCATION

PROJECT ADDRESS

LATITUDE: 40°04'51.03"N

LONGITUDE: 105°32'07.22"W

BRAINARD LAKE RECREATION AREA

BRAINARD LAKE ROAD, WARD, CO 80481

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.

T1.0
T2.0
G1.0
G1.1
G1.2
G1.3
C1.0
C2.0
C3.0
C3.1
C4.0
C4.1
C4.2
C5.0
C5.1
C5.2
C5.3
C5.4
A1.0
A2.0
A3.0
A4.0
A5.0

TITLE OF SHEET

TITLE SHEET

SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES

NIWOT TRAILHEAD DEMOLITION PLAN

NIWOT TRAILHEAD SITE DEVELOPMENT PLAN

NIWOT TRAILHEAD SIGN PLAN

NIWOT TRAILHEAD GRADING PLAN

NIWOT TRAILHEAD RETAINING WALL DETAILS

TYPICAL TIMBER STEPS DETAILS

TYPICAL TRAIL DETAILS

TYPICAL PICNIC SITE DETAILS

TYPICAL EROSION CONTROL DETAILS

TYPICAL EROSION CONTROL DETAILS CONTINUED

TYPICAL EROSION CONTROL BLANKET DETAILS

NIWOT TRAILHEAD PLAN & PROFILE - NORTHWEST TRAIL

NIWOT TRAILHEAD PLAN & PROFILE - LAKE ACCESS TRAIL

NIWOT TRAILHEAD PLAN & PROFILE - PARKING LOT TRAIL

NIWOT TRAILHEAD PLAN & PROFILE - NORTHWEST PICNIC TRAIL

NIWOT TRAILHEAD PLAN & PROFILE - NORTHEAST PICNIC TRAIL

The beginning of the document. Download the full file to read on.

Other documents in this bid