Attachment 4: Pricing Table

Updated

A PDF document (250 KB) attached to Cooling Tower, Roofing, and Structural Construction, from the Bureau of Engraving and Printing. Due Nov 9, 2026, 12:00 PM (UTC-6).

File name: Attachment 4 - Pricing Table.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PROPOSAL FOR 2031ZA26R00027

DATE:

TITLE:

Cooling Towers

OFFICE: District Currency Facility (DCF)
DESCRIPTION OF WORK: This project is a the design build project, requirements, and deliverables, including, but not limited to, a complete

assessment of the scope of work, recommendation of the scope of work, demolition, and the replacement of two existing Evapco cooling towers.

PRIME CONTRACTOR'S WORK

1 Direct Materials

2 Sales Tax on Materials

0% of line 1 0%

3 Direct Labor

4 Insurance, Taxes, & Fringe Benefits

0% of line 3 0%

5 Rental Equipment

6 Sales Tax on Rental Equipment

0% of line 5 0%

7 Equipment Ownership

8 SUBTOTAL

Add lines 1-7

9 Field Overhead

0% of line 8 0%

10 SUBTOTAL

Add lines 8 & 9
Prime Remarks:

Revisions/Comments

SUB-CONTRACTOR'S WORK

11 Direct Materials

12 Sales Tax on Materials

0% of line 11 0%

13 Direct Labor

14 Insurance, Taxes, & Fringe Benefits

0% of line 13 0%

15 Rental Equipment

16 Sales Tax on Rental Equipment

0% of line 15 0%

17 Equipment Ownership

18 SUBTOTAL

add lines 11-17

19 Field Overhead

0% of line 18 0%

20 SUBTOTAL

add lines 18 & 19

21 Home Office Overhead

0% of line 20 0%

22 Profit

0% of line 20 0%

23 SUBTOTAL

Add lines 20 - 22
Sub Remarks:

Revisions/Comments

24 Prime Contractor's Work

25 Sub-contractor's Work

26 SUBTOTAL

27 Prime Overhead on sub-contractor

28 Prime's Home Office Overhead

29 Prime's Profit

30 SUBTOTAL

31 Prime Contractor's Bond Premium

32 TOTAL COST

Estimate time extension and justifications:
Prime Contractor name:
Sub-contractor name:
Signature & Title of preparer:

from line 10
from line 23
add lines 24 & 25
0% of line 25 0%
0% of line 24 0%
0% of line 26 0%
add lines 26 - 29
% of line 30 %
add lines 30 & 31

#VALUE!

#VALUE!

Date

PROPOSAL FOR 2031ZA26R00027

BREAKDOWN OF DIRECT COSTS

ITEMS OF WORK FOR

Prime Contractor

Date:
QTY

UNIT

MATERIAL

Unit Cost

Total Cost

LABOR

Unit Cost
Total Cost

DIRECT Prime Contractor's TOTALS

ITEMS OF WORK FOR

Sub-Contractor
Construction Contractor

R
O

R
O

QTY

UNIT

MATERIAL

Unit Cost

LABOR

Total Cost

Unit Cost

Days

Total

Total (Rental)
Total (Owned)

R

Total Cost

EQUIPMENT

Rate

EQUIPMENT

O

Days

Rate

R
O

Total (Rental)
Total (Owned)

Total

The beginning of the document. Download the full file to read on.