Attachment 4: Pricing Table
Updated
A PDF document (250 KB) attached to Cooling Tower, Roofing, and Structural Construction, from the Bureau of Engraving and Printing. Due Nov 9, 2026, 12:00 PM (UTC-6).
File name: Attachment 4 - Pricing Table.pdf
The full file is for paid members, or buy this bid alone.
Preview
PROPOSAL FOR 2031ZA26R00027
DATE:
TITLE:
Cooling Towers
OFFICE: District Currency Facility (DCF)
DESCRIPTION OF WORK: This project is a the design build project, requirements, and deliverables, including, but not limited to, a complete
assessment of the scope of work, recommendation of the scope of work, demolition, and the replacement of two existing Evapco cooling towers.
PRIME CONTRACTOR'S WORK
1 Direct Materials
2 Sales Tax on Materials
0% of line 1 0%
3 Direct Labor
4 Insurance, Taxes, & Fringe Benefits
0% of line 3 0%
5 Rental Equipment
6 Sales Tax on Rental Equipment
0% of line 5 0%
7 Equipment Ownership
8 SUBTOTAL
Add lines 1-7
9 Field Overhead
0% of line 8 0%
10 SUBTOTAL
Add lines 8 & 9
Prime Remarks:
Revisions/Comments
SUB-CONTRACTOR'S WORK
11 Direct Materials
12 Sales Tax on Materials
0% of line 11 0%
13 Direct Labor
14 Insurance, Taxes, & Fringe Benefits
0% of line 13 0%
15 Rental Equipment
16 Sales Tax on Rental Equipment
0% of line 15 0%
17 Equipment Ownership
18 SUBTOTAL
add lines 11-17
19 Field Overhead
0% of line 18 0%
20 SUBTOTAL
add lines 18 & 19
21 Home Office Overhead
0% of line 20 0%
22 Profit
0% of line 20 0%
23 SUBTOTAL
Add lines 20 - 22
Sub Remarks:
Revisions/Comments
24 Prime Contractor's Work
25 Sub-contractor's Work
26 SUBTOTAL
27 Prime Overhead on sub-contractor
28 Prime's Home Office Overhead
29 Prime's Profit
30 SUBTOTAL
31 Prime Contractor's Bond Premium
32 TOTAL COST
Estimate time extension and justifications:
Prime Contractor name:
Sub-contractor name:
Signature & Title of preparer:
from line 10
from line 23
add lines 24 & 25
0% of line 25 0%
0% of line 24 0%
0% of line 26 0%
add lines 26 - 29
% of line 30 %
add lines 30 & 31
#VALUE!
#VALUE!
Date
PROPOSAL FOR 2031ZA26R00027
BREAKDOWN OF DIRECT COSTS
ITEMS OF WORK FOR
Prime Contractor
Date:
QTY
UNIT
MATERIAL
Unit Cost
Total Cost
LABOR
Unit Cost
Total Cost
DIRECT Prime Contractor's TOTALS
ITEMS OF WORK FOR
Sub-Contractor
Construction Contractor
R
O
R
O
QTY
UNIT
MATERIAL
Unit Cost
LABOR
Total Cost
Unit Cost
Days
Total
Total (Rental)
Total (Owned)
R
Total Cost
EQUIPMENT
Rate
EQUIPMENT
O
Days
Rate
R
O
Total (Rental)
Total (Owned)
Total
The beginning of the document. Download the full file to read on.