Home / Center Support Services Mental Health Consultant for Pine… / Document

Attachment 4: Quality Assurance Surveillance Plan JC

Updated

A PDF document (438 KB) attached to Center Support Services Mental Health Consultant for Pine Ridge JC, from the Forest Service. Due Oct 26, 2026, 1:00 PM (UTC-4).

File name: ATTACHMENT 4 Quality Assurance Surveillance Plan JC.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

US Department of Agriculture (USDA)

Attachment 4 - Quality Assurance Surveillance Plan

1.1

1.2

1.2.1

1.2.2

1.3

2.1

2.1.1

2.1.2

2.2

2.2.1

2.2.2

3.1

3.2

3.2.1

3.2.2

3.2.3

4.1

4.2

Project Name
Job Corps Clinical Support Services - Pine Ridge
Solicitation / Contract Number
12318727Q0003
Section 1: Introduction
This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS). The purpose of this contract is to provide the Centers with a simplified method of obtaining Temporary Clinical Services for vacant federal positions. This plan sets forth the procedures and guidelines that the USDA, Job Corps National Office will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in the PWS. This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.

1.2 QASP Relation to the Contract

1.2.1 QASP Revisions

The Contracting Officer Representative (COR) may make revisions or changes to the QASP procedures and surveillance methods or increase or decrease the degree of surveillance methods at any time during the contract performance period. Changes to the Metric must be incorporated into the PWS, Performance Requirement Summary (PRS) and QASP by a bilateral modification to contract that is issued by the Contracting Officer (CO). A copy of the QASP is provided to the contractor to enable the contractor to enhance its Quality Control (QC) program to perform in accordance with its Quality Control Plan (QCP).

1.2.2 Surveillance of Performance Progression

As the performance period progresses, the levels of surveillance may be altered for service areas where performance is either consistently excellent or unsatisfactory. If consistently good performance, then the amount of surveillance may be reduced. If observations reveal con

The beginning of the document. Download the full file to read on.

Other documents in this bid