Home / Repair Taxiway Alpha & Bravo - North Auxiliary Airfield / Document

Attachment 5: SBML - 100 percent drawings part 2

Updated

A PDF document (3.9 MB) attached to Repair Taxiway Alpha & Bravo - North Auxiliary Airfield, from the Department of the Air Force. Due Dec 2, 2026, 12:00 PM (UTC-5).

File name: Attachment 5 - SBML 1052018 - 100 percent drawings part 2.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SHEET

TITLE

ISSUED

G001

TITLE SHEET

G200

CONSTRUCTION SAFETY & PHASING PLAN (CSPP)

4/21/2017

G201

CSPP PARTIAL AIRSPACE IMAGINARY SURFACES

4/21/2017

G202

CSPP - DROP ZONES

4/21/2017

4/21/2017

G203

CSPP - NOTES

4/21/2017

C001

CIVIL ABBREVIATIONS AND GENERAL NOTES

4/21/2017

C101

EXISTING SITE AND DEMOLITION PLAN - AREA 1

C102

EXISTING SITE AND DEMOLITION PLAN - AREA 2

4/21/2017

C201

SITE PLAN - AREA 1

4/21/2017

C202

SITE PLAN - AREA 2

4/21/2017

C211

MARKING PLAN - AREA 1

4/21/2017

4/21/2017

C212

MARKING PLAN - AREA 2

C220

MARKING DETAILS

4/21/2017

C301

GRADING AND STORM DRAINAGE PLAN - AREA 1

4/21/2017

C302

GRADING AND STORM DRAINAGE PLAN - AREA 2

4/21/2017

4/21/2017

C310

TAXIWAY PROFILES

4/21/2017

C320

TAXIWAY BRAVO CROSS SECTIONS

4/21/2017

C321

TAXIWAY BRAVO CROSS SECTIONS

4/21/2017

C322

TAXIWAY BRAVO CROSS SECTIONS

4/21/2017

C323

TAXIWAY ALPHA CROSS SECTIONS

C620

PAVING DETAILS

4/21/2017

C630

STORM DRAINAGE DETAILS

4/21/2017

C631

STORM DRAINAGE DETAILS

4/21/2017

C701

INITIAL EROSION CONTROL PLAN - AREA 1

C702

INITIAL EROSION CONTROL PLAN - AREA 2

4/21/2017

C711

INTERMEDIATE EROSION CONTROL PLAN - AREA 1

4/21/2017

C712

INTERMEDIATE EROSION CONTROL PLAN - AREA 2

4/21/2017

C721

FINAL EROSION CONTROL PLAN - AREA 1

4/21/2017

FINAL EROSION CONTROL PLAN - AREA 2

4/21/2017

C722

4/21/2017

4/21/2017

C740

EROSION CONTROL DETAILS

C741

EROSION CONTROL NOTES

4/21/2017

E000

ELECTRICAL LEGEND & GENERAL NOTES

4/21/2017

E101

ELECTRICAL DEMOLITION PLAN

4/21/2017

4/21/2017

E102

ELECTRICAL DEMOLITION PLAN

4/21/2017

E201

ELECTRICAL LAYOUT

4/21/2017

E202

ELECTRICAL LAYOUT

4/21/2017

E301

ELECTRICAL CIRCUITING PLAN

4/21/2017

E302

ELECTRICAL CIRCUITING PLAN

4/21/2017

E401

FIXTURE DETAILS IN ASPHALT

E402

FIXTURE MOUNTING DETAILS

4/21/2017

E403

GENERAL ELECTRICAL DETAILS

4/21/2017

E404

GENERAL ELECTRICAL DETAILS

4/21/2017

E405

ELECTRICAL DUCT SECTION DETAILS

4/21/2017

E406

GENERAL ELECTRICAL DETAILS

4/21/2017

E407

SIGN DETAILS

4/21/2017

E408

SIGN DETAILS

4/21/2017

4/21/2017

REVISED

MATCHLINE: AREA 2

MATCHLINE: AREA 1

MATCHLINE: AREA 2

MATCHLINE: AREA 1

MATCHLINE: AREA 2

MATCHLINE: AREA 1

The beginning of the document. Download the full file to read on.

Other documents in this bid