Attachment 6. - RMWT LEO GEPs IDIQ Ordering Procedures
Updated
A PDF document (140 KB) attached to Request for Proposal (RFP) - Resilient Missile Warning Tracking (RMWT) Low Earth Orbit (LEO) Ground Entry Points (GEPs), from the Department of the Air Force. Due Nov 23, 2026, 4:00 PM (UTC-5).
File name: Attachment 6. - RMWT LEO GEPs IDIQ Ordering Procedures.pdf
The full file is for paid members, or buy this bid alone.
Preview
FA240126R0003
ATTACHMENT 6
18 Sep 2026
Resilient Missile Warning Tracking (RMWT) Low Earth Orbit (LEO) Ground Entry Points (GEPs) Ordering Procedures
1. Orders will be issued by a Procuring Contracting O icer in accordance with RFO 52.216-18 “Ordering” Clause of this contract and the following procedures. A. The Contracting O icer will provide the Contractor with a Request for Proposal for each proposed Order citing and providing submittal instructions. In addition, the RFP will include a description of work to be performed and proposal instructions for the described e ort. PCOs and Program Managers are reminded to consider the following when developing RFPs:
1) If a CDRL is required at the individual delivery/task order level, the RFP (and resultant Delivery/Task Order) need to include the applicable DD1423. 2) Any RFO/R-DFARS clauses included in the basic contract are applicable at the individual Delivery/Task Order unless otherwise specified. Clauses identified with fill-ins which are applicable at the Delivery/Task Order level must be contained in the resultant Delivery/Task Order in full text with fill-ins populated. 3) The basic contract is intended to be inclusive of all RFO/R-DFARS/ clauses. Individual Delivery/Task Orders should not contain RFO/R-DFARS/ clauses that are not in the basic contract. In the event that a RFO/R-DFARS/ clause is necessary for an individual Delivery/Task Order, the basic contract should be modified to include the clause.
4) Per 52.216-18(b), “All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.” Verify that proposed Delivery/Task Order Statement of Work does not conflict with the Basic Contract Statement of Work.
5) A DD254 is maintained at the basic contract level. DD254s will also be added to individual delivery/task orders if needed.
6) Prior to releasing an RFP for a new Delivery/Task Order, PCOs should consider if RFO/R-DFARS/ provisions need to be included in the RFP, in particular R-DFARS
FA240126R0003
ATTACHMENT 6
18 Sep 2026
252.227-7992 Identification and Assertion of Use, Release, or Disclosure Restrictions.
7) The subcontracting plan will be maintained at the basic IDIQ contract level and a new subcontracting plan is not required with every new Delivery Order. The contractor is required to update its subcontracting plan as directed by the Contracting O icer. The contractor is responsible for completing is Individual
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 5.a - RMWT LEO GEPs Model IDIQ Contract
- Attachment 5.b - RMWT LEO GEPs Model Task Order 01
- Attachment 7: RMWT LEO GEPs Section L Proposal Instructions
- Attachment 7.a RMWT LEO GEPs Past Performance Questionnaire
- Attachment 7.b. RMWT LEO GEPs Small Business Participation
- Attachment 7.e. RMWT LEO GEPs Personnel & Facilities Template
- Attachment 8: RMWT LEO GEPs Section M Eval Factors
- RMWT LEO GEPs Cover Letter Request for Proposals signed