Home / Wastewater Pretreatment Plant Operation and Maintenance… / Document

Attachment 7: BEP Furnished Equipment

Updated

A PDF document (14 KB) attached to Wastewater Pretreatment Plant Operation and Maintenance Services, from the Bureau of Engraving and Printing. Due Oct 27, 2026, 12:00 PM (UTC-4).

File name: Att 7 - BEP Furnished Equipment.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Attachment 7
BEP Furnished Equipment
In reference to the PWS of the RFQ, the below is a listing of the equipment to be provided by the Government in performance of the contract. Government furnished equipment shall be shared amongst Contractors supporting the Plant, as necessary.

1. Sump Pump Hose

2. Storage Cabinets

3. Fans and Heaters

4. Floor Scale (1)

5. Personal Computers

6. Network Printer (1)

7. Motorized 3 hole punch

8. Sheet laminator

9. The following is a listing of sampling and test equipment: a.

pH Meter

b.

Redox Meter

c.

Assorted Glassware

d.

Jar Test Apparatus

e.

Drying Oven

f.

Analytical Balance

g.

Vacuum Filter Apparatus

h.

Spectrophotometers (2)

i.

Moisture Analyzer, 120g Capacity (3)

j.

Mettler Toledo T7 Auto-Titrator

k.

Lab Refrigerator

l.

DI Water Unit

10. The following is a listing of the Plant safety equipment:

Att. 7

a.

First Aid Kit

b.

Fire Extinguishers

c.

Confined Space Monitors (2)
Page 1 of 1 Page

The beginning of the document. Download the full file to read on.

Other documents in this bid