Home / Aircraft Electrical Component Test Stand (AECTS) / Document

Attachment 7: Questions and Answers

Updated

A PDF document (39 KB) attached to Aircraft Electrical Component Test Stand (AECTS), from the US Coast Guard. Due Dec 15, 2026, 2:00 PM (UTC-5).

File name: Attachment 7 - Questions and Answers - 70Z03826QK0000014.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Attachment 7 – Questions and Answers – 70Z03826QK0000014 1. What are the quote due date and the deadline for questions? Will the due date be extended once the attachments are reposted?
Quotes are due no later than Dec 15,2026, 2:00 PM EST, Questions are due no later than Dec 07, 2026, 2:00 PM EST.
The due dates will not be extended when the attachments are reposted. 2. Is this requirement set aside for small business, or is it unrestricted? The terms and conditions list FAR 52.219-6, and we want to confirm.
This is an unrestricted requirement. FAR 52.219-6 is listed under the FAR clauses incorporated by reference, however, the box is not marked. Therefore, FAR 52.219-6 is not applicable.
3. Attachment 5 shows a 32 ft by 32 ft room labeled Instrument Overhaul 102, while the SOW describes a test cell of about 17.33 ft by 21.66 ft in Building 63, Shop 242. Which space is the installation location?
The room is 32ft by 32ft, however, the USCG requires the new Test Stand to maintain the same footprint and clearances of the current Test Stand. 4. The evaluation language in 52.212-2 refers once to a past performance rating. Will past performance be evaluated, and if so, how?
Award will be made to the o eror submitting the lowest-priced, technically acceptable o er. In making the award determination, the USCG will consider the past performance of the lowest-priced, technically acceptable o eror.
The Government may evaluate past performance using information from prior USCG contracts and purchase orders, delivery-performance data in the Asset Logistics Maintenance Information System (ALMIS), and other available Federal Government sources, including the Contractor Performance Assessment Reporting System (CPARS). 5. Must the DLA Joint Certification Program registration be active when the quote is submitted, or by the time of award?
An active DLA Joint Certification Program registration is required at time of quote submission.

The beginning of the document. Download the full file to read on.

Other documents in this bid