Home / HSR 49.2 MHz RF System Power Amplifiers / Document

Attachment (A) Statement of Work

Updated

A PDF document (653 KB) attached to HSR 49.2 MHz RF System Power Amplifiers, from the Department of Energy. Due Dec 1, 2026, 5:00 PM (UTC-5).

File name: Attachment (A) Statement of Work EIC-RFS-SOW-011.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Docusign Envelope ID: 87BDFD99-CB1D-8039-8038-CC1B587999EE

Electron-Ion Collider, Brookhaven National Laboratory

Doc No. EIC-RFS-SOW-011

Author: Mark Hoffmann Wallner

Effective Date: October 29, 2026

SOW: Statement of Work for the HSR 49.2 MHz RF System Power Amplifiers

Review Frequency: N/A
Revision: 01

STATEMENT OF WORK

for the
HSR 49.2 MHz RF System Power Amplifiers
Quality Classification: A-3

Prepared By:
Mark Hoffmann Wallner, High Power RF Engineer

10/29/2026

Reviewed By:
10/29/2026

Daniel Lukach, Collider HPRF Systems Manager

Alexander Zaltsman, EIC High Power RF Technical Lead

Freddy Severino, EIC RF Controls Technical Lead

Mike Sowinski, High Power RF Engineer

Marcel Romero, Procurement Liaison Engineer

10/29/2026

10/30/2026

10/29/2026

10/29/2026

This document contains BNL procurement requirements and specifications for solicitation and technical evaluation. The information is high-level and does not include the detail necessary for 'development' or 'production' as defined under 15 CFR §772.1, 22 CFR §120.33, or 10 CFR Part 810; therefore, it does not constitute export-controlled technology or technical data.

Docusign Envelope ID: 87BDFD99-CB1D-8039-8038-CC1B587999EE

Electron-Ion Collider, Brookhaven National Laboratory

Doc No. EIC-RFS-SOW-011

Author: Mark Hoffmann Wallner

Effective Date: October 29, 2026

SOW: Statement of Work for the HSR 49.2 MHz RF System Power Amplifiers

Review Frequency: N/A
Revision: 01

10/29/2026

Charles Schaefer, ESH Manager

Christina Sullivan, Quality Assurance

11/3/2026

Approved By:
Warren Halbig, EIC HSR Systems Manager

11/3/2026

This document contains BNL procurement requirements and specifications for solicitation and technical evaluation. The information is high-level and does not include the detail necessary for 'development' or 'production' as defined under 15 CFR §772.1, 22 CFR §120.33, or 10 CFR Part 810; therefore, it does not constitute export-controlled technology or technical data.

Docusign Envelope ID: 87BDFD99-CB1D-8039-8038-CC1B587999EE

Electron-Ion Collider, Brookhaven National Laboratory

Doc No. EIC-RFS-SOW-011

Author: Mark Hoffmann Wallner

Effective Date: October 29, 2026

SOW: Statement of Work for the HSR 49.2 MHz RF System Power Amplifiers

Review Frequency: N/A
Revision: 01

This page intentionally left blank, to accommodate back-to-back printing.

This document contains BNL procurement requirements and specifications for solicitation and technical evaluation. The information is high-level

The beginning of the document. Download the full file to read on.

Other documents in this bid