Gila National Forest Vault Toilet Decommission

SCHEDULE OF ITEMS

Solicitation RFQ# 127EAX27Q0007
Furnish all equipment and labor to complete the project according to all terms, conditions, and specifications.
CG = Campground
LS = Lump Sum
SY = Square Yard
NA = Not Applicable
Base Item
Item

Description
Type
Demolish Big Horn CG toilet Romtec®
Decommission San Fran Hot
CXT®
Springs toilet, remove concrete
sidewalk, and relocate toilet to
Bighorn CG

Unit
LS
LS

Cost ($)

Base Item
Item

Description
Type
Demolish Gomez Peak toilet Romtec®
and remove 5- 5’x5’ sections
of concrete sidewalk
Decommission Mogollon toilet CXT®
& relocate to Gomez Peak

Unit
LS

Cost ($)

LS

Base Item
Item

Description
Type
Demolish Little Walnut
Romtec®
Day Use toilet
Decommission Lower Gallinas CXT®
CG toilet & relocate to Little
Walnut Day Use Area

Unit
LS

Cost ($)

LS

Item 4 is an OPTIONAL ITEM
Item

Description
Demolish Head of Ditch
Campground North toilet
Purchase and install a new
CXT® Gunnison style 6’6” x
14’8” (Brand Name or Equal)
Right Hand Screen,
“Buckskin” color standard
precast concrete toilet
building for installation.
Installation location is at
Head of Ditch CG.

Type
Romtec®

Unit
LS

CXT®

LS

Cost ($)

Base Item
Item

Description
Demolish Kingston
Campground toilet

Type
Romtec®

Unit
LS

Cost ($)

Base Item
Item

Description
Demolish Emory
Pass Heliport toilet

Type
Fiberglass
Structure,
Concrete
Foundation

Unit
LS

Cost ($)

Item 7 is an OPTIONAL ITEM
Item

Description
Purchase a new CXT®
Gunnison style 6’6” x 14’8”
(Brand Name or Equal) Right
Hand Screen, “Buckskin” color
standard precast concrete toilet
building and deliver to Fort
Bayard Administrative Site
(32.842075 ° X -109.140944 °)

Type
CXT®

Unit
LS

Cost ($)

Base Item
Item

Description
Install a 14’7-1/2” x 5’ x 4”
thick concrete slab with “Van
Horn Roll” at each CXT
toilet after installation, 3
CXT units in total.

Type
NA

Unit
SY

Cost ($)

Prices to include all taxes, including Federal, State, & Local where applicable.