Attachment B- Technical Specification for the HSR Main Arc Dipole and Quadrupole Power Supplies
Updated
A PDF document (1.8 MB) attached to HSR HF Dipole and Quad SC Magnet PS and Quench, from the Department of Energy. Due Dec 11, 2026, 5:00 PM (UTC-5).
File name: Attachment B- Technical Specification for the HSR Main Arc Dipole and Quadrupole Power Supplies.pdf
The full file is for paid members, or buy this bid alone.
Preview
Electron-Ion Collider, Brookhaven National Laboratory
Doc No. [Insert here]
Author: Dominic Prevosto
Effective Date: [Insert here]
Specification: HSR Main Arc Dipole and Quadrupole Power Supplies
Review Frequency: N/A
Revision: 00
TECHNICAL SPECIFICATION
for the
HSR Main Arc Dipole and Quadrupole Power Supplies
Quality Classification: A-2
Prepared By:
D. Prevosto, Electrical Engineer
Reviewed By:
K. Pandey, Electrical Engineer
S. Sankaran, Electrical Engineer
R.F. Lambiase, Principal Engineer
D. Bruno, Principal Electrical Engineer
C. Galdamez, EIC Procurement Liaison Engineer
C. Schaefer, EIC Environment Safety & Health Manager
Electron-Ion Collider, Brookhaven National Laboratory
Doc No. [Insert here]
Author: Dominic Prevosto
Effective Date: [Insert here]
Specification: HSR Main Arc Dipole and Quadrupole Power Supplies
Review Frequency: N/A
Revision: 00
C. Sullivan, EIC Quality Assurance
V. Ptitsyn, EIC HSR Performance Lead
R. Feder, EIC TSD Deputy Director
J. Tuozzolo, EIC TSD Director
Approved By:
W. Halbig, EIC HSR Systems Manager,
Deputy Division Director
Electron-Ion Collider, Brookhaven National Laboratory
Doc No. [Insert here]
Author: Dominic Prevosto
Effective Date: [Insert here]
Specification: HSR Main Arc Dipole and Quadrupole Power Supplies
Review Frequency: N/A
Revision: 00
This page intentionally left blank, to accommodate back-to-back printing.
Electron-Ion Collider, Brookhaven National Laboratory
Doc No. [Insert here]
Author: Dominic Prevosto
Effective Date: [Insert here]
Specification: HSR Main Arc Dipole and Quadrupole Power Supplies
Review Frequency: N/A
Revision: 00
REVISION HISTORY
Revision #
Effective Date
Summary of Change
Initial Release
Electron-Ion Collider, Brookhaven National Laboratory
Doc No. [Insert here]
Author: Dominic Prevosto
Effective Date: [Insert here]
Specification: HSR Main Arc Dipole and Quadrupole Power Supplies
Review Frequency: N/A
Revision: 00
1.1
3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.1.7
3.1.8
3.1.9
3.1.10
3.1.11
3.1.12
3.2
3.3
3.4
3.5
3.6
3.5.1
3.5.2
3.5.3
3.5.4
3.5.5
3.5.6
3.5.7
Electron-Ion Collider, Brookhaven National Laboratory
Doc No. [Insert here]
Author: Dominic Prevosto
Effective Date: [Insert here]
Specification: HSR Main Arc Dipole and Quadrupole Power Supplies
Review Frequency: N/A
Revision: 00
3.7
3.8
4.1
4.2
4.2.1
4.2.2
4.2.3
4.2.4
4.2.5
4.2.6
The beginning of the document. Download the full file to read on.