Home / HSR HF Dipole and Quad SC Magnet PS and Quench / Document

Attachment B- Technical Specification for the HSR Main Arc Dipole and Quadrupole Power Supplies

Updated

A PDF document (1.8 MB) attached to HSR HF Dipole and Quad SC Magnet PS and Quench, from the Department of Energy. Due Dec 11, 2026, 5:00 PM (UTC-5).

File name: Attachment B- Technical Specification for the HSR Main Arc Dipole and Quadrupole Power Supplies.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Electron-Ion Collider, Brookhaven National Laboratory
Doc No. [Insert here]

Author: Dominic Prevosto

Effective Date: [Insert here]

Specification: HSR Main Arc Dipole and Quadrupole Power Supplies

Review Frequency: N/A
Revision: 00

TECHNICAL SPECIFICATION

for the
HSR Main Arc Dipole and Quadrupole Power Supplies
Quality Classification: A-2

Prepared By:

D. Prevosto, Electrical Engineer

Reviewed By:

K. Pandey, Electrical Engineer

S. Sankaran, Electrical Engineer

R.F. Lambiase, Principal Engineer

D. Bruno, Principal Electrical Engineer

C. Galdamez, EIC Procurement Liaison Engineer

C. Schaefer, EIC Environment Safety & Health Manager

Electron-Ion Collider, Brookhaven National Laboratory
Doc No. [Insert here]

Author: Dominic Prevosto

Effective Date: [Insert here]

Specification: HSR Main Arc Dipole and Quadrupole Power Supplies

Review Frequency: N/A
Revision: 00

C. Sullivan, EIC Quality Assurance

V. Ptitsyn, EIC HSR Performance Lead

R. Feder, EIC TSD Deputy Director

J. Tuozzolo, EIC TSD Director

Approved By:
W. Halbig, EIC HSR Systems Manager,
Deputy Division Director

Electron-Ion Collider, Brookhaven National Laboratory
Doc No. [Insert here]

Author: Dominic Prevosto

Effective Date: [Insert here]

Specification: HSR Main Arc Dipole and Quadrupole Power Supplies

Review Frequency: N/A
Revision: 00

This page intentionally left blank, to accommodate back-to-back printing.

Electron-Ion Collider, Brookhaven National Laboratory
Doc No. [Insert here]

Author: Dominic Prevosto

Effective Date: [Insert here]

Specification: HSR Main Arc Dipole and Quadrupole Power Supplies

Review Frequency: N/A
Revision: 00

REVISION HISTORY

Revision #

Effective Date

Summary of Change
Initial Release

Electron-Ion Collider, Brookhaven National Laboratory
Doc No. [Insert here]

Author: Dominic Prevosto

Effective Date: [Insert here]

Specification: HSR Main Arc Dipole and Quadrupole Power Supplies

Review Frequency: N/A
Revision: 00

1.1

3.1

3.1.1

3.1.2

3.1.3

3.1.4

3.1.5

3.1.6

3.1.7

3.1.8

3.1.9

3.1.10

3.1.11

3.1.12

3.2

3.3

3.4

3.5

3.6

3.5.1

3.5.2

3.5.3

3.5.4

3.5.5

3.5.6

3.5.7

Electron-Ion Collider, Brookhaven National Laboratory
Doc No. [Insert here]

Author: Dominic Prevosto

Effective Date: [Insert here]

Specification: HSR Main Arc Dipole and Quadrupole Power Supplies

Review Frequency: N/A
Revision: 00

3.7

3.8

4.1

4.2

4.2.1

4.2.2

4.2.3

4.2.4

4.2.5

4.2.6

The beginning of the document. Download the full file to read on.

Other documents in this bid