ILSM 612A4-27-013 Re-slurry and Re-stripe
Safety Permit Request #662
Interim Life Safety Measures (ILSM)
NorCal
Initiated by Lye Saechao
Submitted 8/14/2026
1: Project Infomration
1.1: Project Number
612A4-27-013
1.2: Project Name *
Re-slurry and Re-stripe Bldg. 88 and 98 Parking Lots
1.3: Project COR/Lead Name (last, first) *
Lye Saechao
1.4: Location of activity
McClellan
1.5: Building
x 2
1.6: Room(s)
1.7: Project Description *
The purpose of this project is to re-seal and re-stripe three (3) existing McClellan Clinic parking lots at building 98 and 88. All work shall be outdoors and pedestrian access to and from buildings 98 and 88 shall remain open at all times. Phasing includes closure of one entire lot at a time and reopening when re-seal and re-striping is cured. Alternate parking is planned at Building 911. 1.8: Does this project include multiple tasks/phases? *
x Yes
1.8.1: If yes, list phases with estimated start/stop dates below.
Phase I: B88 Parking Lot, from 11/16/26 to 11/20/26.
Phase II: B98 North Parking Lot, from 11/27/26 to 11/31/26. Phase III: B98 South Parking Lot, from 12/3/26 to 12/7/26. 1.9: Start Date *
1.10: End Date *
11/02/2026
12/31/2026
2: Action Item 1: Exits
2.1: Ensure free and unobstructed exits.
Ensure that, at a minimum, the number of exits required by NFPA 101 are accessible (Note per paragraph 7.4 not less than two exits). Post signage identifying the location of alternate exits to everyone affected. Ensure that staff gets additional training when alternative exits are designated. Buildings or areas under construction must maintain escape routes for construction workers at all times and the means of exiting construction areas are inspected daily. *
Interim Life Safety Measures (ILSM)
Continued on the next page.
Ensure free and unobstructed exits.
Ensure that, at a minimum, the number of exits required by NFPA 101 are accessible (Note per paragraph 7.4 not less than two exits). Post signage identifying the location of alternate exits to everyone affected. Ensure that staff gets additional training when alternative exits are designated. Buildings or areas under construction must maintain escape routes for construction workers at all times and the means of exiting construction areas are inspected daily. continued *
x N/A
2.2: Impacted area/floors
(Note: multiple floors may be impacted, particularly if stairwells are involved)
2.3: Minimum number of exits required on each impacted floor?
2.4: Number of exits impacted on each floor by this project?