612A4-27-013 Re-slurry and Re-stripe
Bldg. 88 and 98 Parking Lots

08-14-26

DEPARTMENT OF VETERANS AFFAIRS

Section 00 01 10

SECTION NO

DIVISION AND SECTION TITLES

DIVISION 01 - GENERAL REQUIREMENTS

DATE

01 00 00

01 33 23

01 35 26

01 57 19

General Requirements
Shop Drawings, Product Data, and Samples
Safety Requirements
Temporary Environmental Controls

08-26
11-23
08-26
01-21

DIVISION 02 – EXISTING CONDITIONS

02 21 13

02 41 00

Site Survey
Demolition

08-26
08-26

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 12 16

33 17 23

Asphalt Paving
Pavement Markings

08-26
08-26

00 01 10-1

612A4-27-013 Re-slurry and Re-stripe
Bldg. 88 and 98 Parking Lots

08-13-26

SECTION 01 00 00

GENERAL REQUIREMENTS

1.11 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

1.19 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT (NOT

01 00 00 -1

612A4-27-013 Re-slurry and Re-stripe
Bldg. 88 and 98 Parking Lots

08-13-26

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare existing parking lot for re-seal and re-stripe. Contractor to furnish labor and materials to perform work as required by drawings and specifications.
Scope:
A. All employees of general contractor and subcontractors shall speak and understand English during construction. Construction areas as defined by the contract documents will be keyed to a construction core when Notice to Proceed is issued. Access to non-construction areas is limited to public areas only. Access needed outside of construction area (i.e., mechanical rooms) will be provided by COTR or his/her representative upon written or verbal request.
C. Prior to commencing work, general contractor shall provide proof that a OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.

D. Training:

1. Beginning July 31, 2005, all employees of general contractor or subcontractors shall have the 10-hour OSHA certified Construction Safety course and /or other relevant competency training, as determined by VA CP with input from the ICRA team.
2. Submit training records of all such employees for approval before the start of work.

1.3 STATEMENT OF BID ITEM(S)

A. See Statement of Work.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Available specifications and drawings will be furnished digitally.

01 00 00 -2

612A4-27-013 Re-slurry and Re-stripe