Schedule B
MACC Seed Project
Repair Dormitory Building 464
DKFX 1072201
Joint Base Lindsey Graham
N. Charleston, SC 29204
17-Sep-26
Item No
Description
Qty
Unit
0001
(Base)
All work required as per drawings and specifications
except as identified in line items 0002-0008 below.
Contractor shall provide a unit price and a total price.
LS
20,000
(EST)
LF
All work associated with removal and replacement of
deteriorated metal stud base or header channels. Price
0003
shall be based on an estimated quantity of 2,000 linear 2,000 (Option) feet of up to 6 inch wide, 25 gage metal channel. (EST)
Payment will be based on actual quantity installed.
Contractor shall provide a unit price and a total price.
LF
All work associated with removal and replacement of
deteriorated metal studs. Price shall be based on an
0002
estimated quantity of 20,000 linear feet of up to 6 inch (Option) wide, 25 gage metal studs. Payment will be based on actual quantity installed. Contractor shall provide a
unit price and a total price.
Hydrojet Domestic + Sanitary Sewer System branch
0004
lines and mains. Payment will be based on actual
(Option) quantity. Contractor shall provide a unit price and a total price.
Replace Bathroom (wet area) Drywall + Insulation
0005
Replacement. Payment will be based on actual
(Option) quantity installed. Contractor shall provide a unit price and a total price.
Replace Inoperable Ceiling Fans. Payment will be
0006
based on actual quantity installed. Contractor shall
(Option)
provide a unit price and a total price.
(EST)
LF
4,000
(EST)
SF
(EST)
EA
Install Electric Entry Door Hardware Set. Payment will
0007
be based on actual quantity installed. Contractor shall (Option)
provide a unit price and a total price.
(EST)
EA
Install Fire Extinguisher Cabinets. Payment will be
0008
based on actual quantity installed. Contractor shall
(Option)
provide a unit price and a total price.
(EST)
EA
Unit Price
Total
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Solicitation
- Solicitation Attachment XU - Past Performance Customer Questionnaire
- Solicitation Attachment XV - Past Performance Survey
- Solicitation Attachment XW - JB Charleston MACC Work Load Estimate
- Solicitation Attachment XX - Task Order Proposal Request Seed Project
- Solicitation Attachment XY - On and Off-Ramp Procedures
- Statement of Work - JB CHS MACC
- Statement of Work - Attachment 1 - JB Charleston Statement of Work for (A E)
- Statement of Work - Attachment 10 - 01 33 00 - Attachment B - JB CHS Request for Information Form
- Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form (Submittal Register)
- Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form (Request for Information Register)
- Statement of Work - Attachment 13 - 01 33 00 - Submittal Procedures