Statement of Work - Attachment 1 - JB Charleston Statement of Work for (A E)
Updated
A PDF document (421 KB) attached to JB Charleston Multiple Award Construction Contract, from the Department of the Air Force. Due Nov 2, 2026, 12:00 PM (UTC-5).
File name: Statement of Work - Attachment 1 - JB Charleston Statement of Work for (A_E).pdf
The full file is for paid members, or buy this bid alone.
Preview
Attachment 1
STATEMENT OF WORK
for
ARCHITECT/ENGINEERING (A/E)
SERVICES
JOINT BASE CHARLESTON
SOUTH CAROLINA
24 March 2026
PART I. STATEMENT OF WORK (SOW)
1. SCOPE OF WORK: Architect-Engineer (A/E) services are required to support Design-Build Task Orders on the Multiple Award Construction Contract (MACC) to support the construction program at Joint Base Charleston (JB CHS). Here, JB CHS encompasses the following locations: Joint Base Charleston - Air Base, Charleston, SC; Joint Base Charleston Weapons Station, Goose Creek, SC; Short Stay Recreational Area, Moncks Corner, SC; North Auxiliary Airfield, North Charleston, SC; Defense Fuel Supply Point, Charleston, SC. In addition, MACC vendors will support Seymour Johnson AFB and Shaw AFB for emergency use. The type of work vendors can expect will include, but is not limited to, new construction, alteration/repair and/or demolition of buildings and structures, roads, grounds, and utilities. Work may also include design/build from concept to full 100% design. Vendors will furnish all materials, equipment, transportation, and personnel necessary for project requirements and to manage and accomplish multiple, simultaneous projects. 1.1. Projects requiring design will be specified on Design Build Task Order Proposal Requests (TOPR), the MACC Contractor shall perform Title I services and/or Title II services. Title I services include all aspects of design, including preparation and/or review of contract plans, calculations, specifications, scheduling and cost estimates, building commissioning services, and preparation of operating and design manuals. These services also encompass those efforts required to support and develop design work, including but not limited to, planning, programming, program management, project scoping, studies, investigations, evaluations, consultations, conceptual through final design, LEED™ analysis and documentation, interior design services, value engineering, geotechnical investigation and surveying.
Title II services include construction quality assurance, oversight of construction, submittal review, inspection and construction supervision. 1.2. Services shall be furnished complete, including all material, equipment, travel, labor, etc.
2. REFERENCES: Hard copies of reference materials will not be furnished. Unified Facilities Criteria and Unified Federal Guide Specifications are available via the Whole Building Design Guide web site (www.wbdg.org). Air Force specific design standards, policies and
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Solicitation
- Solicitation Attachment XU - Past Performance Customer Questionnaire
- Solicitation Attachment XV - Past Performance Survey
- Solicitation Attachment XW - JB Charleston MACC Work Load Estimate
- Solicitation Attachment XX - Task Order Proposal Request Seed Project
- Solicitation Attachment XY - On and Off-Ramp Procedures
- Statement of Work - JB CHS MACC
- Statement of Work - Attachment 10 - 01 33 00 - Attachment B - JB CHS Request for Information Form
- Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form (Submittal Register)
- Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form (Request for Information Register)
- Statement of Work - Attachment 13 - 01 33 00 - Submittal Procedures
- Statement of Work - Attachment 14 - 01 35 26 - Attachment A Accident Investigation