Attachment 1

STATEMENT OF WORK

for

ARCHITECT/ENGINEERING (A/E)

SERVICES

JOINT BASE CHARLESTON

SOUTH CAROLINA

24 March 2026

PART I. STATEMENT OF WORK (SOW)

1. SCOPE OF WORK: Architect-Engineer (A/E) services are required to support Design-Build Task Orders on the Multiple Award Construction Contract (MACC) to support the construction program at Joint Base Charleston (JB CHS). Here, JB CHS encompasses the following locations: Joint Base Charleston - Air Base, Charleston, SC; Joint Base Charleston Weapons Station, Goose Creek, SC; Short Stay Recreational Area, Moncks Corner, SC; North Auxiliary Airfield, North Charleston, SC; Defense Fuel Supply Point, Charleston, SC. In addition, MACC vendors will support Seymour Johnson AFB and Shaw AFB for emergency use. The type of work vendors can expect will include, but is not limited to, new construction, alteration/repair and/or demolition of buildings and structures, roads, grounds, and utilities. Work may also include design/build from concept to full 100% design. Vendors will furnish all materials, equipment, transportation, and personnel necessary for project requirements and to manage and accomplish multiple, simultaneous projects. 1.1. Projects requiring design will be specified on Design Build Task Order Proposal Requests (TOPR), the MACC Contractor shall perform Title I services and/or Title II services. Title I services include all aspects of design, including preparation and/or review of contract plans, calculations, specifications, scheduling and cost estimates, building commissioning services, and preparation of operating and design manuals. These services also encompass those efforts required to support and develop design work, including but not limited to, planning, programming, program management, project scoping, studies, investigations, evaluations, consultations, conceptual through final design, LEED™ analysis and documentation, interior design services, value engineering, geotechnical investigation and surveying.
Title II services include construction quality assurance, oversight of construction, submittal review, inspection and construction supervision. 1.2. Services shall be furnished complete, including all material, equipment, travel, labor, etc.
2. REFERENCES: Hard copies of reference materials will not be furnished. Unified Facilities Criteria and Unified Federal Guide Specifications are available via the Whole Building Design Guide web site (www.wbdg.org). Air Force specific design standards, policies and