Statement of Work - Attachment 14 - 01 35 26 - Attachment A Accident Investigation
Updated
A PDF document (551 KB) attached to JB Charleston Multiple Award Construction Contract, from the Department of the Air Force. Due Nov 2, 2026, 12:00 PM (UTC-5).
File name: Statement of Work - Attachment 14 - 01 35 26 - Attachment A Accident Investigation (CIRS).pdf
The full file is for paid members, or buy this bid alone.
Preview
Initial Report
Follow-up Report
Final Report
Contractor Incident Report System (CIRS)
1. Contract Information
Incident Information
Prime Contractor:
Cage Code:
Contract Number:
Installation of Incident:
Task Order #:
Contracting Activity/ROICC Office:
Contractor Contact Information
Name (Last, First):
Phone #:
Email Address:
Date Notified:
2. Incident Type
(Please Check/Bold All That Apply)
Assault/Violent Act
Extreme Environmental Exposure
Man over the side (No water entry)
Diving
Falls, slip, trip, or bodily exertion
Man Overboard - Water Entry
Electrical Shock/Burns
Fires - All Types
Material Handling Equipment
Equipment
Installation/Repair
Hazardous Material (any type)
Ordnance-Related (Explosive)
Explosion, Non-Ordnance
Industrial
(Select Additional Below)
Vehicle (Government or Private)
Industrial Incident Additional Information
(Please Check/Bold All That Apply)
Confined Space
Hand and Power Tools
Work Platforms and Scaffolding
Demolition/Renovation
Rigging
Underground Construction, Shafts, and
Caissons
Trenching/Entrapment
Cranes and Hoisting Equipment
Concrete, Masonry, Steel Erection and
Residential Construction
Traffic Control
Floating Plant and Marine Activities
Tree Maintenance and Removal
Welding and Cutting
Pressurized Equipment and System
Airfield and Aircraft Operations
Control of Hazardous Energy
Fall Protection
Contractor Incident Report System (CIRS)
3. General Information
Incident Information
Date of Accident:
Time of Accident:
Describe the accident in detail in your words: (Use the back of page if you need additional space)
Exact Location of Accident:
Were Hazardous Material(s) Involved
Yes
No
If Yes, Explain What Hazardous Materials Were Involved and Why:
Who Provided Clean-up?
Onsite
Base
Public
Activity of the injured person at the time of incident:
Personal Protective Equipment: (Check/Bold Response)
Available and used
Available and not used
Not related to Mishap
Wrong PPE for job
Not Required
List PPE Used:
Contractor Incident Report System (CIRS)
4. Fully Explain What Allowed or Caused the Incident:
Incident Information
Direct Cause:
Indirect Cause:
Additional Action Taken: (Please Include a Begin Date and Est. End Date in Description)
Additional Action Taken: (Please Include a Begin Date and Est. End Date in Description) (Use the back of page if you need additional space)
5. Contributing Factors:
Was Visibility Restricted?
Unit of Measure (Check/Bold):
Yes
No
Feet
Distance Visibility was restricted:
Yards
Meters
Miles
Nautical Miles
Visibility Restricted By: (Check/Bold all that apply)
Fog
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Solicitation
- Solicitation Attachment XU - Past Performance Customer Questionnaire
- Solicitation Attachment XV - Past Performance Survey
- Solicitation Attachment XW - JB Charleston MACC Work Load Estimate
- Solicitation Attachment XX - Task Order Proposal Request Seed Project
- Solicitation Attachment XY - On and Off-Ramp Procedures
- Statement of Work - JB CHS MACC
- Statement of Work - Attachment 1 - JB Charleston Statement of Work for (A E)
- Statement of Work - Attachment 10 - 01 33 00 - Attachment B - JB CHS Request for Information Form
- Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form (Submittal Register)
- Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form (Request for Information Register)
- Statement of Work - Attachment 13 - 01 33 00 - Submittal Procedures